My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
824
>
2300 - Underground Storage Tank Program
>
PR0231459
>
COMPLIANCE INFO 1994 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 1:43:59 PM
Creation date
11/7/2018 12:24:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2009
RECORD_ID
PR0231459
PE
2361
FACILITY_ID
FA0003677
FACILITY_NAME
DIAMOND GAS AND FOOD MART
STREET_NUMBER
824
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118003
CURRENT_STATUS
01
SITE_LOCATION
824 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\824\PR0231459\COMPLIANCE INFO 1994 - 2009.PDF
QuestysFileName
COMPLIANCE INFO 1994 - 2009
QuestysRecordDate
2/16/2017 6:45:24 PM
QuestysRecordID
3339010
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Procedure <br /> 1. Figure 4 of the TLS-3XX Site Prep Manual, P/N 576013-879, must be consulted for proper installation of the <br /> Carbon Canister into hazardous locations with direct wiring. <br /> 2. During the installation, all required National,State and local safety codes must be followed. <br /> 3. The CCVP contains an integral vapor valve that operates in parallel with the site pressure/vacuum (PM vent. <br /> Location of the vapor valve outlet must conform to Article 514 of the National Electrical Code (NEC) and <br /> NFPA 30/30A. <br /> 4. Do not install the CCVP on unsupported vent pipes. If the vents are not attached to a support structure or a <br /> wall,a support structure must be installed prior to mounting the CCVP. <br /> 5. A straight coupling or union is required at the base of the vent pipe installation. For new or rebuilt sites, it is <br /> recommended that the installation design specify a threaded fitting for joining the vent pipes to the <br /> underground piping system. <br /> Q 6. IMPORTANT!To assure that the canister outlet is 12 feet(minimum above grade,the CCVP <br /> mounting bracket must be located as shown in Figure 1 and the U-bolts tightly damped to the <br /> vent pipe before mounting the canister. <br /> 7. Following all required national,state, local and site safety precautions,carefully hang the CCVP's notched <br /> support tabs onto the top two side studs of its mounting bracket(Step 1 in Figure 2),swing the canister down <br /> until all of the slots in the canister's side mounting tabs seat against the studs in the bracket (Step 2 in <br /> Figure 2),then tighten the six side nuts to secure the canister onto its bracket (Step 3 in Figure 2). <br /> 8. Figure 3 shows important reference dimensions and required clearances of the installed canister. <br /> 9. Install weather tight junction boxes (2 required) and conduit per all N EC, State and local codes(see example <br /> installation in Figure 1). <br /> ided in the <br /> 10. vapor valve, <br /> observing theplug polarities(see Figure 4).The othewo-pin connector of the 6-foot r endvof this cable istpassed ion through a kito the t suppled cord grip <br /> P 9P <br /> in the upper junction box. <br /> from <br /> he vapor valve to the <br /> 11 Connect the white wire e sensor wire from the <br /> TLS Console Smart Sensor Interface module (see two conductor e Fig et5).Connect the black pwi ery on the two conductor <br /> cable to the negative sensor wire from the TLS Console Smart Sensor Interface module. <br /> 12. Following the instructions in Figure 6,seal the wire nuts of each of the two cable connections in the epoxy <br /> pack provided. <br /> 13. Attach CCVP vapor valve field wiring to the Smart Sensor Interface Module in the TLS console as shown in <br /> Figure 7. <br /> 14. Connect all lower fittings,valve and tubing between the vent pipe and the lower manifold on the CCVP. <br /> 15. Confirm ball valve is in the open,canister to vent stack position (per Figure 3),then insert the clevis pin and <br /> secure with the hitch pin. <br /> 16. A passing pressure decay test, in accordance with CARB TP-201.3,must be completed after the CCVP is <br /> installed (see Exhibit 4 of VR 2031 VR 204). <br /> 17. A passing operability test must be completed in accordance with the procedures defined in VR 203/VR 204 <br /> Exhibit 11 &12. <br /> 18-4 <br /> ARB approved IOM 18-Carbon Canister Vapor Polisher Installation and Maintenance Guide-Executive order VR-203 and VR-204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.