My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
824
>
2300 - Underground Storage Tank Program
>
PR0231459
>
COMPLIANCE INFO 1994 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 1:43:59 PM
Creation date
11/7/2018 12:24:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2009
RECORD_ID
PR0231459
PE
2361
FACILITY_ID
FA0003677
FACILITY_NAME
DIAMOND GAS AND FOOD MART
STREET_NUMBER
824
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118003
CURRENT_STATUS
01
SITE_LOCATION
824 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\824\PR0231459\COMPLIANCE INFO 1994 - 2009.PDF
QuestysFileName
COMPLIANCE INFO 1994 - 2009
QuestysRecordDate
2/16/2017 6:45:24 PM
QuestysRecordID
3339010
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
veeder-Root Parts <br /> Installation Procedure <br /> A ,s B <br /> C <br /> Make sure that <br /> the ends of cable <br /> sheathing are R <br /> sub-merged in <br /> sealant Tie wrap <br /> Wire nuts <br /> Instructions: <br /> NOTE: When temperature is below 50°F (10°C), keep 4. Mix thoroughly to a uniform color by squeezing <br /> contents and forthresin In a warm place prior to mixing (e.g., in an 5. quee ebm mixed,warm resin 0iinto one and of bag and <br /> inside pocket next to body). cutoff other end. <br /> 1. Open epoxy sealant package,and remove resin pak. 8. Slowly insert wiring connections into sealing pack <br /> 2. Holding resin pak as shown In A, bend pak along until they fit snugly against the opposite end as <br /> long length. shown in C.end of to <br /> 3. As shown in B. firmly squeeze the RED SIDE of the 7. and too position the ieawreppedand eend up tie until the resin <br /> resin, forcing it through the center seal and Into jells. <br /> BLACK SIDE. <br /> _ CAUTION:Epoxy sealant is irritating to eyes.respiratory system, <br /> *y.Rj (z O �'1 and skin.Can cause allergic skin reaction.Contains:epoxy resin <br /> !� and Cycloaliphatic epoxycarboxylate. <br /> Precautions:Wear suitable protective clothing,gloves,eye,and <br /> face protection.Use only in well ventilated areas.Wash <br /> thoroughly before eating,drinking,or smoking. rea•«r�wsew <br /> Figure 8. Epoxy sealing CCVP vapor valve field wiring connections <br /> INTRINSICALLY SAFE BAY OF TLS CONSOLE <br /> SMART ► rt 3T+4T+sT+s T.7-1 <br /> .— WIrYr Mia% <br /> SENSOR r e a a e. a ra voc <br /> oz ne <br /> SMART SENSOR/PRESS MODULE <br /> Attach Cable Shields to Ground <br /> Lug Closest to Conduit Entry <br /> __ , <br /> Rigid Condurt(enters Console <br /> through an I.S.Bay knockout) <br /> + <br /> CCVP Valve <br /> Figure 7 Attaching CCVP vapor valve wiring to TLS-350 Console <br /> 18-9 <br /> ARB approved IOM 18-Carbon Canister Vapor Polisher Installation and Maintenance Guide-Executive Order VR-203 and VR-204 <br />
The URL can be used to link to this page
Your browser does not support the video tag.