Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN- PAGE I One form er facili <br /> TYPE OF ACTION 3t I.NEW PLAN ❑ 2.CHANGE OF INFORMATION ROL <br /> I. FACILITY INFORMATION <br /> FACILITY ID 4 (Agency Use Only) _ _ 1. <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Qua- <br /> BUSINESS SITE ADDRESS 103. BUSINESS SITE CITY im <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> D if safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly i a licable <br /> EQUII,PMENTAA <br /> LOCAT�I/OItNilwL AVAILABILITY <br /> VAILABILITY <br /> Rio, Gero Rea <br /> "0 <br /> '✓A /7 AT5 kit mi. lAC70 /t R31 <br /> . <br /> V7l— ;tv P/� R12R22, ,, R32. <br /> V R13. R3hw cl ,4-( / ) <br /> R33_ <br /> R14. R24. R34. <br /> 66 (/ RIS. R25. ass, <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WOnRK NECE�S�SARyYl UNDER THIS RESPONSE PLAN: <br /> NAME V—KA L 60 Q- [+A-MMM RooTITLE <br /> R5o <br /> NAME . <br /> R41 TITLE R51. <br /> NAME R42_ TITLE R52. <br /> NAME R43_ TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION X. INSPECTION BY QUALIFIED PERSONS [13. RECALIBRATION OF EQUIPMENT Rha, <br /> ❑99. OTHER(Specify): R61, <br /> UN-022D www.unidoes.org 113-Rev. 12/14/10 <br />