Laserfiche WebLink
RECEIVED <br /> UNIFIED PROGRAM CONSOLIDATED FOICT <br /> UNDERGROUND STORAGE TANK FEB 14 2014 <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE OF ACTION ❑ 1.NEW PLAN 19 2.CHANGE OF INFORMATION <br /> PLAN TYPE (3 I.MONITORING IS IDENTICAL FOR ALL USTI AT THIS FACILITY. HEALIM ULIAli lMtN 1490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME) w �G✓ 3 <br /> BUSINESS SITE ADDRESS 2�05e&Al kle CA <br /> 103. CITY 109. <br /> 11.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): 490-3a <br /> 490-3b <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/NIAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 49x5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS �,a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.6 <br /> PANEL MANUFACTURER: h�+.K ��--__---_-_-_ __--aso-9-_MODEL#-__�3L_.___._._.-_-_____---_40 10 <br /> 90-8 <br /> LEAK SENSOR MANUFACTURER: - MODEL#(S): Q <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR 2643) 490.11 <br /> PANEL MANUFACTURER: 490.12' MODEL#: 490-13 <br /> IN_TANK PROBE MANUFACTURER 40-14._-MODEL#(S):-_____ 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49°-16 <br /> d MONTHLY El e.OTHER S ed 490'12 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c OTHER(Specify): 4�19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490'21 <br /> 49 n <br /> ❑ S.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT ISZ9a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURE R. �p O 490-30 1 MODEL#: 490.31 <br /> LEAK SENSOR MANUFACTURERG5 9- 090-22 MODEL#(S)_pAQ (T Z�US� °9°-33 <br /> MANUFACTUREF.0 490-11 <br /> _ ____. _._-_-____-__ _ 1-- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 19a,YES ❑b.NO 490.34 <br /> FAILUREOISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. fya.YES ❑b.NO 490.35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> -_-_-_-PRODUCT FLOW WHEN A LEAK IS DETEC490-36 <br /> TED123 CCR§26362 -__-_-- __- -_-_-_- <br /> MLLD MANUFACTURER(S): 490.12 MODEL#(S): 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CICR§2636) 490-39 <br /> ELLD MANUFACTURERS) 490'40 I MODEL#(S): 49°'41 <br /> _ _----_--_--___-__-___ .__.-___ <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.MINIMUM MONTHLY 0.2 g.p.h. [32.MINIMUM ANNUAL 0.1 g.p.h. 4x°-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49041 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> •Allowed far monimdn ofwb.fed...m .niatar NO p1paing.1y per HSC§25281,5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)J. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.71S CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490 53 <br /> UPCF UST-D(12/2007)1/4 <br />