My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
824
>
2300 - Underground Storage Tank Program
>
PR0231459
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 11:18:41 AM
Creation date
11/7/2018 12:27:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231459
PE
2361
FACILITY_ID
FA0003677
FACILITY_NAME
DIAMOND GAS AND FOOD MART
STREET_NUMBER
824
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118003
CURRENT_STATUS
01
SITE_LOCATION
824 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\824\PR0231459\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
2/21/2017 5:37:44 PM
QuestysRecordID
3341592
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, RECEIVED <br /> OCT 21 2016 <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING &I�ARO�IftaF=41TAI U& <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑ProliMPAI i T <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauges inPsi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 140' Approx. 130' Approx. 110' <br /> Product Stored: Regular 87 Plus 89 Super 91 <br /> Method and location of Test boot at Test boot at Test boot at <br /> piping-run isolation: STP Pi in Sum #1 STP Piping Sump#2 STP Piping Sump#3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:10 8:45 10:25 <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:10 9:45 11:25 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Rt): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.