My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
824
>
2300 - Underground Storage Tank Program
>
PR0500213
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 2:41:28 PM
Creation date
11/7/2018 12:28:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0500213
PE
2381
FACILITY_ID
FA0004693
FACILITY_NAME
BRESHEARS CHEVRON
STREET_NUMBER
824
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118003
CURRENT_STATUS
02
SITE_LOCATION
824 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\824\PR0500213\COMPLIANCE INFO PRE 2016 .PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
2/15/2017 11:02:19 PM
QuestysRecordID
3338620
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) A tank does not ve more than 5 perforation in any one <br /> square foot (not to e larger than one half in in <br /> diameter . <br /> A) A tank with more than twenty perforations in a five <br /> hundred square foot area. <br /> X. APPLICATION OF THE FIBERGLASS REINFORCED LINING <br /> The final linining shall have minimum thickness of 90 to 100 <br /> mills with atleast a 25 to 30 percent fiberglass content. <br /> Fiberglass lining will meet the following specifications: <br /> TENSILE STRENTH: 40 ,000 PSI <br /> FLEXURAL STRENTH: 69 ,000 PSI <br /> FLEXURAL MODULUS: 220 ,000 PSI <br /> COMPRESSIVE STRENTH: 42,000 PSI <br /> BONDING: 1200 TO 1500 PSI <br /> XI. INSPECTION AND TESTING <br /> Once the application of fiberglass lining material has been <br /> completed, it will be checked with a barcol tester to ensure <br /> proper cure. A holiday test at a mininmum of 35,000 volts will be <br /> used to detect any pinholes and to ensure that the fiberglass <br /> lining material is tight. Personnel performing the testing shall <br /> be thoroughly trained in the use of the testing equipment. If <br /> any defects are found, they will be repaired. Before final <br /> closing of the tank , a quarter inch steel plate with the minimum <br /> deminsions of 8"x 8" shall be installed under the fill and <br /> gauging tubes. <br /> XII. TANK CLOSING <br /> If an opening has been cut, a steel cover plate that is rolled to <br /> the contour of the tank will be installed. The steel cover plate <br /> shall overlap atleast two inches on all sides. Once the cover <br /> has been sandblasted to white metal on both sides, it will be <br /> bolted down to the tank with self tapping bolts and with resin <br /> applied between the cover plate and the tank. After the lid has <br /> been bolted to the tank , the entire surface of the lid will be <br /> applied with fiberglass lining material with a 3 inch overlap to <br /> the tank. Once the fiberglass lining material has cured, the lid <br /> is to be holidayed at 35,000 volts for pinholes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.