My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
824
>
2300 - Underground Storage Tank Program
>
PR0500213
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 2:41:28 PM
Creation date
11/7/2018 12:28:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0500213
PE
2381
FACILITY_ID
FA0004693
FACILITY_NAME
BRESHEARS CHEVRON
STREET_NUMBER
824
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118003
CURRENT_STATUS
02
SITE_LOCATION
824 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\824\PR0500213\COMPLIANCE INFO PRE 2016 .PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
2/15/2017 11:02:19 PM
QuestysRecordID
3338620
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESURFACING <br /> If desired by <br /> customer, we will <br /> backfill and resurface <br /> (the 4'x 4'hole above <br /> the tank). <br /> WHY NOT SHIELD <br /> YOUR TANK?® <br /> Armor Shield has unique <br /> coatings which cure in <br /> two to three hours. <br /> imam <br /> Properly cured coatings <br /> are essential to coating <br /> • TESTING performance.Once the <br /> V� tank is closed,the <br /> Lines from the tank can be checked from inside, if requested, adequacy of the cure <br /> prior to closing the tank. For additional information,see back page. ti, cannot be verified.Armor <br /> Shield's applicators are <br /> ' iF+t�1 able to do the necessary <br /> inspections after the <br /> coating of the tank.No <br /> three day wait for coating <br /> r. <br /> to cure or closing of tank <br /> before the coating has <br /> cured and is tested.The <br /> tank is returned to <br /> service the same day with <br /> ARMOR SHIELD! <br /> a. Optional (patent pending) �~ <br /> overlapping lid, with a bolt <br /> on removable manhead <br /> may be installed. <br /> • SEALING ACCESS OPENING ,armor 4 , 41-ctb„ <br /> The entry hole that has been cut into the tank is resealed <br /> with an overlapping lid. <br /> Copyright® 1985 Amcor Shield Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.