Laserfiche WebLink
a0AR0 OF TRUSTEES <br />_ <br />SAN JO*rQUIN <br />James CulWflaon, Pfee, <br />LOCAL HEALTH DISTRICT <br />SERVING <br />Patricia E. Vannuccl, Secy. <br />City of Lodi <br />Anlhonelt• Van Spronsen <br />1601 East Hazelton Avenue, P. O. Box 2009 <br />San Joaquin County <br />Earl PimentelCity <br />Stockton, California 95201 <br />of Escalon <br />City of Manteca <br />Fan Bupbee <br />- <br />Daniel L. Flores <br />209/466-6761 <br />City of Hlpon <br />John 0. Most. M.O. <br />City of StocktonCity <br />William J. Wade <br />Jopl Khanna, M.O., M.P.H., District Health Officer <br />of Tracy <br />San Joaquin County <br />Mary Anna Love <br />San Joaquin County <br />T <br />Facility Name <br />l e_ X Q_jC D <br />Address `l 4l <br />F , i <br />Date of Inspection—S_ �_ Inspector <br />MONITORING ALTERNATIVE 87 <br />Limited to underground <br />storage tanks which have infrequent inputs <br />and withdrawals and <br />where the liquic: <br />level in the tank can be measured to an accuracy <br />of +5 gallons or less <br />when the tank is <br />half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />Lank gauging performed as follows: <br />L1 -----Tank must be capable of being secured to prevent unauthorized inputs and <br />w.thdrawals. <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />L,, -'Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />/ locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. �7 <br />f 1. )Precision test(s) must be performed by 14- IS /and results submitted to this <br />office within 30 days of the test. <br />Tank gauging must be started immediately. (See instructions above). <br />the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />