My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2300 - Underground Storage Tank Program
>
PR0232535
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:36:55 PM
Creation date
11/7/2018 12:44:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0232535
PE
2361
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
02
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\W\WASHINGTON\2526\PR0232535\BILLING.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA wr 'ceo <br /> w STATE WATER RESOURCES CONTROL BOARD Wyo <br /> C <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B <br /> Cnl.non nen <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM F72 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: Coqw A 4ii 2 Z <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.O.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) I <br /> D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-1 IS MARKED.COMPLETE ITEM C. <br /> A ❑ 1 MOTOR VEHICLE FUEL ❑ s OIL IL O. ❑ taUNLEA ED REGULAR 8 6 DIESEL <br /> ❑ 8 AVIATION GAS <br /> ❑ 2 PETROLEUM V90 EMPTy ❑ 1 PRODUCT ❑ lbPREMIUM <br /> E IUM 5 JET FUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED W OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.8: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.S.AND C,AND ALL THAT APPLIES IN BOX <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK s CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> MATERIAL ❑ <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 UNETIGHTNESSTESTING ❑ 3 WNRO G ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH yES ❑ NO ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> IPwNrEo a 91GNAT116E1 <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE LD.#�D6 25 F�Fq = 10159 I I I I pl q <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (4901 THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. (� <br /> F'XO(a9.w l� <br />
The URL can be used to link to this page
Your browser does not support the video tag.