My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_1998 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:01:47 PM
Creation date
11/7/2018 12:49:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2001
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\W\WEST\4040\PR0231963\COMPLIANCE INFO 1998 - 2001 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Business Inventory Reconciliation (BIR Option) MMM Do, YYYY HH:MM XM Page <br /> The TLS-350R,in addition to accurately measuring the con- TO PRINT A RECONCILIATION REPORT SHIFT RECONCILIATION <br /> tents of each tank,also monitors the amount of fuel dis- T 1:REGULAR UNLEADED <br /> pensed at the pumps. Press Untlf the dlSplay Shoals. OPENING DATE F TIME: <br /> RECONCILIATION MODE MMM DD, YYYY KH-MM xM <br /> The volume of fuel dispensed is then compared with the fall PRESS<FUNCTION>TO CONT CLOSING DATE & TIME: <br /> in fuel level in the appropriate tank;by this means the TLS- MMM DD, YYYY HH:MM xM <br /> 35OR can recognize the very small differences which could <br /> indicate a leak.This process is called reconciliation. Press Q twice and a once,and the display will show. OPENING VOLUME: <br /> ssu GALS <br /> DELIVERIES: <br /> The results of the reconciliationp rocess are available as DISPLAY AND PRINT 0 GALS <br /> Reconciliation Reports.These reports are available for REPORT TYPE:SHIFT METERED SALES:aoo GALS <br /> each worked shift,for each day,or for any other specified MANUAL ADrUSTMEN0 ` <br /> Press ® Qfor a Shift Report. ° GALS <br /> period. p CALCULATED INVNTRY: <br /> 5211 GALS <br /> The Shift Reconciliation Report is illustrated opposite. See Press O Q O for a Daiort. GAUGED INVNTRY-. <br /> p PP Daily Report. 5211 GALS <br /> also Automatic Reports,) WATER HEIGHT: <br /> 2.11 INCH <br /> Press © Q fora Periodic Report. VARIANCE: • <br /> o GALS <br /> Press three times to return to the Operating mode. <br /> KEY SYMBOLS: Q Backup Q Change Q Enter®Function©Mode Q Print©Step Q Tank/Sen—r <br />
The URL can be used to link to this page
Your browser does not support the video tag.