My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1257
>
2300 - Underground Storage Tank Program
>
PR0231463
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:06:28 PM
Creation date
11/7/2018 1:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0231463
PE
2361
FACILITY_ID
FA0003707
FACILITY_NAME
AHMEDS SONS INC
STREET_NUMBER
1257
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015015
CURRENT_STATUS
01
SITE_LOCATION
1257 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\Y\YOSEMITE\1257\PR0231463\1991 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK INSPECTION RECORD <br /> (t TM- <br /> /NEW TANK INSTALLATION <br /> SITE NAME n_ NE�i2O�� �1�Y0 INSPECTOR'S NAME ` G<-p1, L),— <br /> '—ADDRESS`.ADDRESS CITY 4,i_ct_ G'f' ZIP <br /> CONTRACTOR: NAME --f.tea Pr (� S-It PHONE / <br /> OWNER: NAME _ C LiPvi'O r PHONE <br /> DIS INSPECTOR'S <br /> DATE PPROVED PPRDVED INITIALS <br /> ITEM OR EQUIPMENT INSPECTED <br /> /�t`/� �� 1. Fees paid [� <br /> Lti <br /> (!�t -� Plans Approved <br /> INITIAL INSPECTION <br /> i�l7�u <br /> . UL numbers 37y Y3 r,[C_ tank size 5 y.r• UL <br /> Tank tested upon delivery [Holiday (plastee t) or air at 5 PSI (FRP)I <br /> 9 ( _ _ -/11 Visual inspection of secondary containment. <br /> -7 7 �+ Tank appropriately placed with approved backfill. <br /> (PING STAGEINSPECTION <br /> 5rs� <br /> 1. Pressure test of piping. [Primary and Secondary (NFPA 30)) <br /> ���y ✓ 2. Ball float valves Ins tatted. <br /> 3. Overfill protection installed, describe: <br /> �y 4. Unused tank opening sealed and cathodicat(y protected. <br /> A60 5. Visual inspection of secondary containment on piping. <br /> y y C 0 6. Monitoring ports in place and brought to grade. (lockable weather proof covers) <br /> 7. Fill and vent piping brought to grade. <br /> w B. Product line leak detector in place. (Hard wired) ! <br /> ,�./ i <br /> 9. Approved tank teak monitoring device installed. <br /> 0 10. All galvanized piping and fittings properly wrapped. <br /> 1. Pressure decay test on complete tank and product delivery system. <br /> INAL INSPECTION <br /> �'� ✓// 4 Sy/�1 e 1. Precision test successfutty completed and hard copies received. (NFPA 329) <br /> g. 2. Spill protection at fit( pipe. <br /> b� Y / 3. Performance test of overfill protection system. <br /> 4. Performance test of product line leak detector. (Hard wired) <br /> 5. Performance test of continuous monitoring systems) on tank (s) <br /> 6. Permit to operate application complete. <br /> 7. Acceptable recordkeeping system. <br /> Comments: <br /> EN 23 006 10/B9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.