Laserfiche WebLink
E. Piping Materials and Construction: <br /> Primary Containment 7L ��-� sTzG, Gn ss �5 %�y4ss <br /> Manufacturer/Model <br /> Secondary Containment <br /> (if applicable) C o s ' rManufacturer/Model -- -- <br /> F. Type of product delivery system (i .e. , pressurized suction) <br /> G. Piippi.,n/g .leak detection/monitoring system: <br /> 1�I Leak detector on pressurized line (for motor vehicle fuels only) <br /> anufacturer — Qct ✓ �% — <br /> 1_ Continuous monitoring device within the secondary containment, connected to an <br /> audible/visual alarm system. <br /> Manufacturer <br /> I�f �,ai1 <br /> Y 'monitoring of the space between the primary and secondary contain- <br /> ers using "dip stick" readings or visual determinations. <br /> Please specify Z d o 0 <br /> I_1 Other <br /> H. Describe the tank overfill protection system you plan to use. Check all that apply. <br /> cE:,1Product level sensing device equipped with high level alarm and/or automatic <br /> shut off device. Specify type: �, r <br /> I_ Ball float valve on vent and vapor lines('PRy„ r� ;3•�-- c�-.F-oL'r �.[„� <br /> 1_1 Other, Explain C*- ,.+ �� ie°kdtk.kJ eti, - E <br /> F57 RP) <br /> I. Indicate type/manufacturer of vapor recovery system to be used: <br /> �9 P <br /> ���C i___!_- .'V <br /> NOTE; Those systems with product flow thru the vapor lines during normal <br /> require secondary containment of these lines. operation <br /> J. What is the approximate depth to ground water? <br /> Basis of determination K. Attach a certification from the manufacturer, or his authorized representativof the <br /> tank and piping materials as to the capability of the tank and piping materials to w� <br /> store the proposed hazardous substances. <br /> L. Attach three copies Of Plans showing: / <br /> Location of all existing and proposed structures V <br /> 2. Location of all existing underground tanks and piping (indicate if tanks are to he <br /> removed or abandoned) <br /> i� Location of all proposed tanks and piping and their secondary containment <br /> v4. Cross section of tank and piping system including secondary containment, overfill <br /> protection equipment, monitor ports and equipment, extension of all pipe, <br /> ports to finish grade <br /> I1-2 <br /> r <br />