Laserfiche WebLink
i <br /> NEW UST IN ALLATION INSPECTION RECORD <br /> FAqw CILITY NAME: DLIV. (�% d C. ADDRESS: /y 2fJ <br /> SWEErPS9 TANK= ULt TANK MMEL/MI(TERIAL: <br /> CAPACITY: PREDICT: R.E.H.S- <br /> A I <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> O I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PAIS SERFITED/ FEES PAID (H+S CODE 25287, CCR 2635 OD) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAIMMIEMT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/MIN: RRIME(LIBUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: HRS/MIM- <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEA (MINIMUM 40 PSI/30 MIN) (CCR 2635 (B) (4)) <br /> 7_ SECONDARY PIPING CXTAINKENT TEST PSI: HRS/MIN: OTHER: (CCR 2635 (A) (4)) <br /> 8. LAKE TEST ON ALL SIPS (24 HR. MINIMUM) RRS: (CCT( 2635 (A)) <br /> 9. UNUSED TANK OPEII7GS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FTTTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> 12_ PERFORMANCE TEST FOR 'AL1' MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (8) (5)) <br /> 16. BALL FLOAT VALVES IISTALLED (CCR 2635 (B) (6)) <br /> 17. OVERFILL PRCIMION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> 18. TANK ACCESS P'ONiS BROUGHT TO GRADE (LOCOED AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19.ff INTEGRITY TEST (PASSING HARD COPT) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, MSPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. 'C' FORM COMPLETED AMD SUBMITTED (CCR 2635 (E)) <br /> 22. MONITORING METHOD FOR ALL TAMKS AND PIPING APPROVED (CCR 2641-2644) <br /> 23. ALL CONDITIONS IEC; FACILITY PERMIT ISSUED (H+S CODE 25234 (E) (F)) <br /> COMMENTS: <br /> EH23406 3/92 (REVISED 11\92) <br /> 8 <br />