Laserfiche WebLink
j NEW UST I14STALLATION INSPECTION RECO& <br /> ADDRESS: <br /> =f�ACILITY NAME: '- f'�� �tL"/ZvD . <br /> SNEEPSS TAMU ULO TANK MOOELMATERIAL: <br /> CAPACITY: <br /> PRODUCT: R.E.N.S: <br /> A I <br /> P M ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S (DDE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3- IMSPECTICN AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: sow- PSI: NRS/NIN: BRINE(LIQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: MRS/MIN: <br /> 5. TANK APPROPRIATELT PLA® WITH APPROVED BACKFILL (COt 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST OUNMN 40 PSIm MIN) (COC 2635 (B) (4)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRSMIM: OTHER: CCCR 2.635 (A) (4)) <br /> 8. LAKE TEST ON ALL MPS (24 HR. MINIMUM) RRS: (COR 2635 U)) <br /> 9. UNUSED TANK OPE1mGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> 10. OVERSPILL PE)RFCRSPXCE TEST (COR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) _— <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR '!LLL' MONITORING PROBES (CCR 2632 (C) (2)) <br /> 13. PERFCRKA14CE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 44. PERFORMANCE TEST OF LIME LEAK DETECTION (CCA 2632 (D) 2635 (8) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHIT-OFF (CCR 2635 (e) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> 17. OVERFILL PROTECTION INSTALLED/APPROVED (CCA 2635 (E) (2)) <br /> 18. TANK ACCESS PCRTS BROUGHT TO GRADE CLOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19.PGP INTEGRITY TEST (PASSING GIRD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PW, RESPONSE PLAN AND LOG BOCK ON SITE (CCA 2632 (E) (1) (2)) <br /> 21. 'C' FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> 22. MONITORING METHOD FON ALL TANKS AMD PIPING APPROVED (COR 2641-2644) <br /> 23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (INS CODE 25254 (E) (F)) <br /> COMMENTS: <br /> EHZ3406 3/92 (REVISED 11\92) <br /> 8 <br />