Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 MAR 254 of_ <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard $1RS�'ENT <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Sump#1-87 Sump#2-87 Sump#3-Diesel Sump# <br /> Sump Diameter: 46"Hexagon 46"Hexagon 46"Hexagon <br /> Sump Depth: 38" 38" 38" <br /> Sump Material: Poly Poly Poly <br /> Height from Tank Top to Top of 8„ 8" 8" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 6„ 6" 6" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' *See Comments *See Comments *See Comments <br /> Does turbine shut down when <br /> sump sensor detects liquid(both <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?* <br /> Was fail-safe verified to be <br /> operational?* <br /> Wait time between applying water <br /> and starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rc): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testing.? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Piping Sumps not tested with this testing event. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />