My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
21710
>
2300 - Underground Storage Tank Program
>
PR0504306
>
REMOVAL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2022 2:57:53 PM
Creation date
11/7/2018 3:40:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1988
RECORD_ID
PR0504306
PE
2381
FACILITY_ID
FA0006158
FACILITY_NAME
PURE GRO/BREA
STREET_NUMBER
21710
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
21710 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\21710\PR0504306\REMOVAL 1988.PDF
QuestysFileName
REMOVAL 1988
QuestysRecordDate
8/3/2017 10:25:09 PM
QuestysRecordID
3553408
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Patrick G. Durham <br /> October 21, 1988 <br /> Page 2 <br /> II. Chemical Analysis <br /> Anametrix Laboratory Services of San Jose, California tested one <br /> soil (PG-1) and one water (GW-1) sample retrieved from the tank <br /> excavation pit for the following: <br /> o Total Volatile Hydrocarbons (TVH) with benzene, toluene, <br /> ethylbenzene and xylene (EPA 5030 & 8020 w/BTEX) <br /> o Ethylene Dibromide <br /> o Total Lead <br /> Results of laboratory analysis are summarized in Table 1. <br /> Samples obtained below the gasoline tank excavation indicate that <br /> no contamination is present in the soil or in groundwater below <br /> the tank pit. Lead was detected at a level of 13 . 3 ppm, clearly <br /> a back ground level. <br /> A copy of the laboratory report as well as the chain of custody <br /> appear in Appendix II. <br /> III . Site Completion <br /> The material removed for tank excavation was placed back in the <br /> open pit and compacted along with clean fill brought on site. <br /> No further action is deemed necessary at the Pure Gro facility. <br /> If you have any questions, please call at (415) 829-0661 . <br /> Sincerely, <br /> Matthew J.GHopwood ent 'A. Madenwald, P.E. <br /> Staff Geologist Project Manager <br /> SCS Engineers SCS Engineers <br /> MJH/KAM/kma <br /> Attachment <br /> cc: Jaime Favila, R. S. <br /> Environmental Health Division <br /> San Joaquin Local Health District <br />
The URL can be used to link to this page
Your browser does not support the video tag.