Laserfiche WebLink
12/11/2002 'WED 08:58 FAX 2098146 MAINT & ENGINE SHOP � Q006/009 <br /> SWRCD,January 2002 Page of <br /> 5- PTPJNd SUW T TIXG <br /> Test Method Developed Sy: ❑Sump Manufacturer Industry Standard ❑Professional Engineer <br /> 0 Other(Specify) <br /> Fest Method Used: ❑Pressure D'Vacuum Rydrostatic <br /> ❑Other(Specify} <br /> Test Equipment Used: Equipment Resolution: <br /> Sump# Sump Sump# Sump# <br /> Sump diameter: +%� �• <br /> Sump Depth: y -- <br /> Sump Material: r5 <br /> Height from Tank Top to Top of r' <br /> Highest Piping Penetration; —_ <br /> Height from Tank Top to Lowest �r* <br /> Filectrical Penetration: <br /> Condition of sump prior to testing: w qp�T <br /> Portion of Sump Tesledl , (° <br /> Does turbine shut down when <br /> sump sensor detects liquid(moth ❑Yes 13 No ETNA ❑Yrs ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water? - <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?` <br /> El Ll No Z-I�A ❑Yes ❑No DNA ❑Yes ❑No ❑NA ❑Yes ❑No 11NA <br /> Was fail-safe verified to be ❑Yes i7 No F114A ❑Yes 0 No ❑NA 0 Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressurelvacuum/water and starting <br /> test. Zp .� <br /> Fest Start Time: ZO <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RI-): <br /> Test <br /> Test Duration_ <br /> Change inrReading(Rp-Rj): <br /> Pass/Fail Threshold or Criteria: <br /> � e's5`:• :Q�+'g�:''?.: yi:f�,:.E '�' °°�• •:T3rl�'ass:-�fl-�all�:l;: kass:;.. <br /> Was sensor removed for testing? a-Yes ❑No ❑NA O Yes 0146 ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑1 NA <br /> Was sensor properly replaced and 2 fes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No 0 NA ❑Yes ❑No ❑NA <br /> verified functional after testin . <br /> CommentS—(include informuliurr on re,�irs made yjiur to testing,ad recomm Lnoelow-u r failed tesls) _ <br /> t <br /> If the entire depth of the sunup is not tested,specify how muoh was tested. if the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA',the entire sump must be tested, (See SWRCB LG-160) <br />