Laserfiche WebLink
SAN JOAQUIN (X)UPIIBLIC HEALTH SERVICES ENVIRONMENTAL IVSION <br /> UNDERGROUND STORAGE TANK PROGRIU4 - FEE WORKSHEET <br /> S FACILITY SITE NAME FACILITY CONT CTMAKE <br /> �i y <br /> T <br /> 'E FACILITY ADDRESS SITE PHONE # with AREA COOS <br /> IliqZ [' q6 <br /> S ` <br /> CITY STATE ZIP CODE # of TANKS <br /> A �� Tom'1 CkW ��--� at SITE CJ CJ tA�r �i�� <br /> P <br /> APPL[CA BILL]NG NAME 7 /" APP IC�lANT CONTACT NAME <br /> L l C U) - I Cs SI-74-Trol�l <br /> C ILING ADDRESS APPLICANT PHONE it WI AREA CODE <br /> N <br /> T CITY STATE ZIP CODE �=nstaiiation, <br /> LICATION <br /> etc.) <br /> l_+ TOTAL <br /> PXI <br /> 861987 1988 1989 1990 <br /> ANNUAL FACILITY FEE (Prior to January 1, 1991) = 5100,00A XX XXXX I XXXX %XXX LXXk 5 %XXXXXXX <br /> C <br /> T FACILITY PENALTY FEES ASSESSED (If Applicable) XXXX XXXX XXX% LXXXLXXX S kXXXXXXX <br /> I - <br /> V TANK FEE = S50.00/TANK (Prior to January 1,1991) 5170/TANK (After January 1, 1941) <br /> E <br /> I Tanks = 1488 1989 1990 1991 11992 1993 1994 1995 11996 1997 1998 <br /> F (multiply # by feefor <br /> A each year applicable) LXX% LXXX XX%X X%XX XXXk 5 <br /> C <br /> I TANK PENALTY FEES ASSESSED XXXX %XXX I XXXX XXXX XXXX I 5 <br /> L <br /> I STATE SURCHARGE FOR NEW FACILITIES ONLY=s18.50 5 <br /> T <br /> Y # Tank& x 38.00 1988 through 1993 (556) 1993 through 1997 (556) 1998 <br /> SURCHARGE FOR 1998 XXXXXXXXX%XXXXXXXXXXXXXX%XX XX%XXXXXXXXXXXXX%XXXXXX s <br /> C PERMANENT CLOSURE (Removal or Authorized Closure-in-P Lace) TANK I.D. #(s) <br /> L _ <br /> 0 CLOSURE FEE = S78.00/hour (3 hours minimum/TANK) # TANK(s)—f - X 5234.00 <br /> S <br /> U TEMPORARY CLOSURE (Plan Review & Inspections) TANK I.O. #(s) <br /> R <br /> E TEMPORARY CLOSURE FEE = 578.00/hour (3 hours minimum/FACILITY) 5234,00 minimum 5 <br /> P INSTALLATION PLAN CHECK (Plan Review b Construction Inspections) TANK I.D. #(s) <br /> L <br /> A <br /> N PLAN CHECK FEE = $78.00/hour (8 hours minimum/FACILITY) - S624.00 minimum 5 <br /> R REPAIR FEE (Workplan Review 8 Construction Inspections) TANK i.0. #(s) <br /> E <br /> P TANK LINING REPAIR FEE = S78.00/hour (3 hours minimum/TANK) # TANK(s) X 5234,00 S <br /> A 4 <br /> I TANK RETROFIT REPAIR FEE = S78.00/hour (3 hours min./FACILITY) = 5234.00 minimum 5 <br /> R <br /> PIPING REPAIR FEE = 578.00/hour (3 hours minimum/FACILITY) = 5234.00 minimum S <br /> M TRANSFER FEE = S20.00 UNAUTHORIZED RELEASE EVALUATION = 578.00/hr S <br /> I <br /> S <br /> C CONSULTATION FEE = 578.00/hr SAMPLING INSPECTION FEE = 578.00/hr S <br /> TOTAL DUE s <br /> FOR OFFICE USE ONLY <br /> _..._ .....»........ ......i.,i.__—_.x...l..r..lrn..:r..rsnn==.._...__—.___ :•'»"�—:......__us:.».::.:......._:::cc::ic: :rss .. <br /> jr- <br /> ME <br /> SWEEPS # COMPUTER # LOC CODE DIST CODE AMOUNT RECEIVED CHECK ;*/CASH RECEIVED 3Y DATE RECEIVED i <br /> as <br /> .i: .. .�.._.__........_.. _...._._.........__.____.............._ .__..-.._:._......«-.... Y»......._....._....». t»_.._._«....._....- »....,....r._.-._.....- <br /> ME <br /> rw 71 n17 (RFVISFD 1-12-98) <br />