My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1997-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2300 - Underground Storage Tank Program
>
PR0231431
>
COMPLIANCE INFO 1997-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 10:59:45 AM
Creation date
11/7/2018 4:09:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2004
RECORD_ID
PR0231431
PE
2361
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1071\PR0231431\COMPLIANCE INFO 1997-2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 � <br /> ' gas APR 15 2003 <br /> ENVIRUINNIENT HEALTH <br /> PERMIT/SERVICES <br /> WAYNE PERRY, INC. <br /> Environmental Remediation, Construction and Consulting <br /> April 14, 2003 <br /> Environmental Health Department <br /> San Joaquin County <br /> 304 East Weber Ave. <br /> Stockton, California 95202-2708 <br /> Attention: Ray Von Slue <br /> To Whom It May Concern: <br /> This letter is in regards to a permit issued to Wayne Perry, Inc. for work to be done at Main Street Shell, 1071 N. Main <br /> Street, Manteca. <br /> on <br /> ot was <br /> aced <br /> pr August 12, 2002, p U. Rersepaired and orand 3&4�replaG d penetration boots under dispenseere removed. The 2x3 secondary rs according ng to manufacture <br /> acturee 87 <br /> product under dispenserp <br /> specifications. <br /> On August 13, 2002, pre-tested dispenser pans 1&2 and 3&4 to ensure integrity of pans. Replaced dispensers purge lines <br /> and put back in service. Removed dispensers 5&6 and 7&8. The 2x3 secondary termination boot was replaced under <br /> dispenser 7&8. Pre-test 87 and 91 product line secondarys to insure the Integrity of the lines. Repaired and or replaced <br /> penetration boots under dispensers according to manufacture specifications. <br /> On August 14, 2002, Pre-test dispenser pans 5&6 and 7&8 to ensure integrity of pans. Replace dispensers 5&6 and 7&8, <br /> purge lines and put back in service. <br /> On August 20, 2002 the SB 989 Testing was conducted per all SB 989 regulations. All items Passed. <br /> An emergency permit was issued on August 13, 2002 to break concrete and repair per manufacture specifications in the <br /> event of a secondary leak under ground. <br /> Sincerely, <br /> John Cascio <br /> Project Manager <br /> Wayne Perry,Inc. <br /> 30 Main Ave. Suite 5 Sacramento, California 95838 Phone (916) 646-9680 Fax (916) 646-9683 <br />
The URL can be used to link to this page
Your browser does not support the video tag.