Laserfiche WebLink
Monitoring Svstem Certification-Pas of 3 <br /> Site Address: 1071 N.Main St. Date of Testing/Servicing: 3-7-2001 <br /> F. In-Tank Gauging f SIR Equipment: N1 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the follo ing checklist: <br /> ❑ Yes 0 No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> Yes L3No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> COm late the ing checklist: <br /> Hi Yes Ll No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance'? <br /> ❑ NIA (Check all that apply) Simulated leak rate: IT 3 g.p.h.'; ❑ 0.1 g.p.h.?; ❑ 0.2 g.p.h.` <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> El Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Hl NIA <br /> O Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> FCINo* <br /> A <br /> � Yes * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> A or disconnected? <br /> ® Yes For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> A malfunctions or fails a test? <br /> 0 Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ❑x Yes Ll No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> UN-036-516 http:llwww.unidocs.org Rev.08/22/00 <br />