My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2300 - Underground Storage Tank Program
>
PR0231431
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:02:00 AM
Creation date
11/7/2018 4:17:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231431
PE
2361
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1071\PR0231431\INSTALL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/19196 18:41 FAX 5106756130_- -.-- --- _ SHELL OIL__ _ .-_--- - - l7;iiO3/004 <br /> UNDERG ND STORAGE TANK MONITORING PROGRAM <br /> This motutorin.g�rrogramW bee kept at the UST location et all tunas_ fotmlion on this MA.-itoring <br /> program are conditiott6 of the operating parfait. The perrait Molder tmt9t notify San 3oaagrairs C <br /> Bavimnrnmtal`health Di�risim,phone(209) 468-3420 within 31D days of aany CbaD8= to the m0uitoring <br /> procedut..A, uraess required to obtain approval befom makiAg the change. <br /> R,equtred by Sections 2632(d)sed 2641(h) CCR. <br /> Facility NaTne. ec , e _ <br /> Facility Address 1071 N95h n St <br /> _A. Describe the frequency of performing the monitoring: <br /> Tank Cgnjinucys <br /> Piping Leak Detector wl Positive hutotf <br /> B. What methods and equipment, identified by name and model, will be used for performing. <br /> the monitoring: <br /> _ niaU SDQ= m nitorli7e an <br /> P.l' tr4 Y iiiverltory <br /> t2 $fi i <br /> piping Veeder Rn�� PLLT) an .pr t�.�Ce�sen5rats surrsp rtllaui x td <br /> mtinuous it gnitrhpa under eaci9 4 Nrg;er. --- <br /> C. Describe the location(s)where the monitoring will be peiformed (facility plat plan should <br /> be attached): <br /> The monitor panel in lot ateri near the a tnc <br /> D. List the name(s) and title(s) of the people responsible for pezforrning the mnitoring <br /> andl€ir maintaining the equipment. <br /> S,1regh Na amDealer ---- <br /> han J D — -_- <br /> -j3W2gj..Qil1 a E. Reporting Format for monitoring; <br /> Tank: A written a 100, ...� ._.._�-•— <br /> Piping: nnual certi i a <br /> F. Describe the preventative maintenance schedule for the monitoring equipment. Nate: <br /> NUintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months. <br /> The monitoring U► ems sb&U be ceztified a�� ina��-r,r�anoe with manufacturers <br /> reacvminerlri farts <br /> G. Desca'ibe the training necessary for the operation of UST system, including piping, and <br /> the monitoring equipment- <br /> The <br /> ---_ ----- <br /> ra .._ :are trained in ggM d o u Cfilr&rq <br /> SE89�9 eWFIV13d -IRA WOdA bdd�O 9 X661-6L–� <br />
The URL can be used to link to this page
Your browser does not support the video tag.