My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2300 - Underground Storage Tank Program
>
PR0231431
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:02:00 AM
Creation date
11/7/2018 4:17:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231431
PE
2361
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1071\PR0231431\INSTALL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PLAN REVIEW GUIDELINES <br /> a. The enclosed pian review sheet is provided for your information to assist you in interpreting <br /> our requirements for your new UST system. <br /> b. A copy of the California UST Regulations may be obtained from the State Water Resources <br /> Control Board at (916) 739-4332. <br /> C. Permits and/or plan check approval may also be required by the San Joaquin Air Pollution <br /> Control District,County/City Building Department and Fire District in your respective area. <br /> d. Complete and submit the State Water Resources Control Board "Facility Permit (A)` and <br /> "Tank Permit (B)" application forms. <br /> e. A minimum of 3 inspections will be conducted on the UST system installation. A $78 per <br /> hour inspection fee shall be charged for additional inspections or reinspections as required. <br /> (See required inspections below) <br /> Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br /> reported and approved by PHS/EHD prior to installation. <br /> g. Application for installation of underground tanks are only valid for the calendar year in which <br /> it has been issued. A permit may be extended into the next calendar year if a letter is sent <br /> to PHS-EHD requesting this extension thirty days prior to the end of the calendar year. A <br /> one year--one time extension may be granted by PHS-EHD upon receipt of this letter. <br /> 4. REQUIRED INSPECTIONS <br /> All appointments for inspections must be made at least 48 hours in advance for the following: <br /> a. Primary and secondary tank(s)shall be tested pneumatically at 3 - 5 p.s.i. for one hour, one- <br /> half hour for primary tank and one-half hour for secondary tank. Double walled tanks are <br /> exempt if annular space is monitored using either pressure or vacuum testing. (All external <br /> connections shall be soap tested while under pressure) <br /> b. Pressure piping shall be hydrostatically tested to 150% or pneumatically tested to 110'%'0 of <br /> maximum anticipated system pressure but does not less than 5 lbs. per square inch at the <br /> highest point of the system for a minimum of 20 minutes. <br /> C. All lines other than pressure piping shall be pressure tested at not less than 3 p.s.i. and not <br /> more than 5 p.s.L for a minimum of 20 minutes and soap tested while under pressure. <br /> d. Containment sumps shall pass a 24 hour leak test. <br /> e. Overfill protection shall be capable of draining liquid back into fuel tanks. <br /> e. Monitoring system shall pass a functional test. The functional test shall consist of the <br /> activation of the alarm via the monitoring probes/sensors. <br /> f. Final inspection and approval to operate will be granted after the above requirements are <br /> satisfied and a hard copy of the precision test is submitted to inspector at site. <br /> The contractor's approved printset of the UST installation shall kept at the job site and must be shown to the <br /> inspector upon request. In addition, the Local Fire Department shall approve UST installation prior to <br /> commencement of work. <br /> If you need further assistance, or wish to schedule an appointment to discuss the plan review or field <br /> inspection, please contact our Underground Storage Tank Staff at (209) 468-3427. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.