My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 EVR PHASE II PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2008 EVR PHASE II PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 1:37:48 PM
Creation date
11/7/2018 4:19:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 EVR PHASE II PLAN
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1103\PR0232587\EVR PHASE II 2008.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OWNER". CHEVRON Chevron <br /> CONTACT: <br /> BILL SEAY145 S. STATE COLLEGE <br /> surrE 400 <br /> BLVD. <br /> BREA, CA 92821 <br /> µ <br /> 10 <br /> liedlergroup <br /> Architecture <br /> W A A akEn irteerin <br /> aPlanning <br /> GRAPHI .Project Management <br /> 2322 West Third Street <br /> SITE VICINITY <br /> ,.., .. Los Angeles,(;A <br /> 90057-1906 <br /> Phone:(213) 381-7891 <br /> kap: 213 38.1-1517 <br /> .a fiedler roe p.co <br /> EXISTING e0 A ° <br /> EXISTING BUILDING <br /> TRAS <br /> ENCLOSURE <br /> ,�w " r r 1"IN � <br /> 0 NEW BU <br /> I <br /> . <br /> ER <br /> EXISTING VENT <br /> :. „_.,. <br /> 0 <br /> I NGS RISE I <br /> ui <br /> 0 INEW EAN <br /> SEP CLTGR AIR <br /> CITESW171P > COMPLIANCE N <br /> EXISTING H MONITOR IST. V/R <br /> ' ,. <br /> ZK 07-44-0 KV PM MW <br /> ENCLOSURE <br /> 1. AND E I I <br /> FIELD FIELD <br /> LOCATION TO THE <br /> ATTENTION OF THE OWNERS ENGINEER FOR P <br /> (9 1I <br /> 0 DISTING DR (I)CIWORK.THE <br /> STING <br /> SLAB N aIMONITOR I 2. G E PERMIT' FROM ApKVRE <br /> 00 I O DISPENSER VAW-00 OR MOIRE IN DEPTH INTO WHICH A <br /> . OF I NG FILL PERSON IS REQUIREDDESCEND. <br /> 39 SUMP .) z <br /> 3. ALL MATERIALS SHALL BE COMPATIBLEH USE FOR THE INTENDED PURPOSE AS <br /> EXISTING T KPER NATIONAaY RFOOGNIZED CODES. LOCAL CODES AND GOVERNING AUT'HOIRMF.13. <br /> SLABI 1l 0 <br /> 4. FUELING SYSTIEM TO BE 06KCITO TIP B D , <br /> �. I <br /> ®) I 7 0 U)- <br /> f <br /> 5OWNERS REPRESENTATIVE PRIOR TO 6D K IN <br /> E <br /> UNLMM / M. . TANK A D INTEGRay TESTS <br /> I TMK SYSTEM BEING <br /> IN OPERATION (S7 <br /> UNLMED66PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUK11KC p <br /> I I <br /> .. .,. ESS 0 1 . INCLUDE 7 IBC.; 2007 ANNULAR SPS T K. <br /> I .. . <br /> w 6. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW <br /> 2007 CFC CHAPTER 14. FIRE " <br /> EKTINGUISHERS SHALL BE PROVIDED. THE 1 <br /> A t� SPRINKLER I AT .OF <br /> CIRCUMSTANCE E <br /> cv G EXISTINGU.G. <br /> T K <br /> EXISTING U PIPING . 1 <br /> STING <br /> E ASSUME L Tlf� TURBINE SUMP 1SCOPE OF WORK <br /> ) - EXISTING DISPENSER ' 1 CONTRACTOR TO REMOVE EXISTINGISPENS AIS ( ) NEW WAYNE ovAnON <br /> ISLAND ( +a) DISPENSER OF E INSTALLED HEALY VACUUM PUMP. <br /> IEXISTING <br /> COLUMN 1� G G ra I l HARDWARE UIP <br /> IPER EVIR PHASE II ENIPMENT & CARBEG ORDER —202—F <br /> e <br /> INSTALL <br /> Y V/A. Y SI HOSES, A NOZZLES, <br /> ? INSTALL X0000000 E—G E T IS S.ELECTRICALGO7 Durr AS REQUIRED. Am= IMM NNIMMML <br /> EX <br /> I APPROACH 000000 ®® 9 IN N CONNECTOR G 7 IFC LIN <br /> ������O IN UIQ SUMP P IIUPGRADE <br /> 1 G TG INSTALL T EVR <br /> vs P POSED S 1 2.17 DISPENSER N TANKS.) NEW IS PRESSURE S <br /> C) <br /> 0 <br /> C . CONTRACTOR� CLO INSNI NEW <br /> SIR EP PRESSURE r G I IS T <br /> sr <br /> CONTRACTOR TO WsrALL NEW VACUUM GE 1° ExisTING VENT RISER & CONNECT TG <br /> c� <br /> p« ExisnNG 2 2 PORT THREADEDCOUPLING. <br /> CONTRACTOR TO INSTALL NEW CLEAN AIR SEPARATOR UNIT WITH METAL ENCLOSURE. SIX ADORM <br /> PAINT/FINISH TO <br /> GG G T IN T TAIL N EXEW ISTINGBUILDING. <br /> 1 I <br /> U @ MISSION RIDGE DRIVE <br /> SOUTH MAIN STREET 5 CONTRACTOR 94�9/iN&&GG@�y CALIFORNIA <br /> T UPGRADE T I N SENSOR <br /> 86 E <br /> MODULERE—PROGRAM TO MONITOR TANK SUMPS, DISPENSER SUMPS, <br /> -- IS <br /> L„ } <br /> ,. .. ,:, S U PAG Q <br /> 1 <br /> TANK TO G L w <br /> DESKM W. F9 Fft <br /> _ lc' � . <br /> I (1),NON.-VENTED CHECK VALVE..'J", RC <br /> 7 G4 R GUT G ®F lS <br /> 0 ISLANDS D SLAB. PATCH P CONCRETE ISLANDS D CONCRETE RC <br /> 0 SLAB, AFFECTIED BY NEW UDC INSTALLATION. <br /> S G S LOCATE, INTERCEPT . GUT I, PRODUCT D VAPOR LINES, ®06/11/06 12121 <br /> EXTEND AND CONNECT PIPING TO NEW UDC SUMP. <br /> DROM 7M- <br /> V) <br /> (1) <br /> r) <br /> SITE PLAN <br /> 1\ DISPENSER REPLACEMENT AND TANK CONVERSION <br /> AS <br /> _.. <br /> I _----_______ INFORMATION_ - _ Underground <br /> PREPAREDI WITHOUT BENEFIT FUELING is TOLL FREE <br /> a.> TITLE REPORT, SURVEY, POSITIONS 12 <br /> 1 -800 <br /> 0 OR LEGAL DESCRIPTION. GLI E NOZZLES 12 <br /> 227-2600 <br /> DRAWING REFLECTSI I <br /> SITE CONDITIONS <br /> MEASURED. TK1 lol <br /> ISLANDS A DISPENSE TWO WORKING D DIG <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.