<br /> MATERIAL AND WORKMANSHIP 15. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE PIPING REMOVAL, SOIL TESTING PLAN CS N M
<br /> TO, THE STANDARDS OF THE FOLLOWING: 40, OR EXTRA STRONG. GALVANIZED PIPE 15 NOT ALLOWED. FITTINGS W N X
<br /> 1. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL SHALL BE 300 PSI MALLEABLE IRON. 1.0 GENERAL INFORMATION M Q
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) LL
<br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE M05T SUITABLE AMERICAN PETROLEUM INSTITUTE (API) E: ALL STEEL PIPE BELOW GRADE 15 TO BE DOUBLE W'RAPFED WITH 20 1.1 LOCATION OF TANKS: QUIK STOP 125
<br /> GRADE FOR THE FROCE55 INTENDED. AMERICAN 50CIETY FOR TESTING AND MATERIALS (ASTM) MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL 1580 WEST MAIN I!-' O
<br /> UNIFORM BUILDING CODE (UBC) TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. RIPON, CA 95366 I11I U 0
<br /> 'S
<br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OWNERAGM ENT FOR HIS NATIONAL ELECTRIC CODE (NEC) 1209) 599-4261
<br /> Lo
<br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER AND NATIONAL FIRE PROTECTION AGENCY (NEPA) F: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT W T-
<br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE UNDERWRITER'S LABORATORIE5, INC. CUL) WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL 1.2 OWNER QUIK STOP MARKETS, INC. F„
<br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND CALIFORNIA CODE OF REGULATIONS (CCR) COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WFRE
<br /> ITH RE ENTERPRISE AYE. Q z Z W) W)
<br /> ,TOR CONTEMPLATES LOCAL ORDINANCES PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH
<br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRAMONT, CA 94535
<br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. (510) 65'1-8500 n
<br /> I6. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN, FOR THE
<br /> 3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN GALLED FOR BY THE DURATION OF THE CONTRACT, A SITE HEALTH 4 SAFETY PLAN THAT WILL G: G.G. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL 1.3 PROJECTED PROJECT START: 30 JUN 98 p� M W O 0
<br /> OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. to m r r
<br /> APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES FOR TANK / LINE REMOVAL AND INSTALLATION, PRIOR WORK START, AND: 13. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER 1.4 TANKS: 3 DBL. WALL FIBERGLASS, BY XERXES !EXISTING TO REMAIN) I��L.� d' LL M LA
<br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK WHEN SO ll�
<br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE A: APPOINT AN EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS SHOWN ON 1.5 HISTORY: INSTALLED 1985
<br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE DRAWINGS. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING
<br /> HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF IS NOT SHOWN ON SITE PLAN, G.G. SHALL RUN LINES THE MOST DIRECT Ib CONTRACTORS:
<br /> 4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED THE SAFETY OFFICER TO THE OWNER'S AGENT PRIOR TO COMMENCING WORK ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. MM
<br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT ON THE SITE. GENERAL: TO BE DETERMINED o
<br /> REJECTION. 14. PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'S
<br /> B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE GEOLOG15T: COMPLIANCE 4 CLOSURE Lact�?
<br /> L
<br /> �
<br /> j 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES PRECEDENCE OVER OTHER INSTRUCTIONS. 1020 KOLL CENTER PARKWAY, 0134 C7
<br /> REGULATIONS. NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE PLEASANTON, CA 94566
<br /> WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS A: G.C, TO NOTIFY OWNER'S REPRESENTATIVE TWO WORDING DAYS PRIOR (510) 426-5395
<br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS OR HAZARDOUS SUBSTANCES BE UNCOVERED. TO LINE TESTING. OWNER'S REPRESENTATIVE SHALL WITNESS ALL LINE
<br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION TESTING. MARK TEST FRESSURES ON GAUGE WITH ELECTRICAL TAPE AT 2.0 REMOVAL OF PIPING
<br /> OF THE OWNER'S ENGINEER C: CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH EMPLOYEES BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (1)
<br /> AND SUPPLY THE MEETING MINUTES t0 OWNER WHEN REQUESTED. HOUR AND BE WITNE55ED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL SAN JOAQUIN CO. DEPARTMENT OF ENVIRONMENTAL HEALTH DIVISION
<br /> 1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. GUIDELINES AND 501L AND GROUNDWATER SAMPLING REQUIREMENTS Q � 1 r K STOP T OP
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS D: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP SHALL BE FOLLOWED AT ALL TIMES, EXCEPT WHERE THE FOLLOWING V� V f� a7 I"
<br /> PROJECT, IT IS EXPECTED THAT THE MOST RESTRICTIVE CONDITION(5) OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE B: TEST PRESSURES SHALL BE: SPECIFICATIONS ARE MORE RESTRICTIVE. 125
<br /> WOULD APPLY. CONDITION. IF THE CORRECTIVE ACTION 15 INSUFFICIENT IN THE 2" - 50 PSI AND APPLY SOAP SOLUTION. G
<br /> OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL 3" - 40 1=51 AND APPLY SOAP SOLUTION. OWNER SHALL FILL ALL U5Ts TO 10% OF CAPACITY, PRIOR TO START.
<br /> CORRECTIVE ACTION CAN BE IMPLEMENTED. 3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION. 1550 UJEBT MAIN
<br /> � GENERAL CONDITIONS PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO
<br /> E: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM C. CAUTION: DISCONNECT FLEX CONNECTOR FROM 5TP AND CAP PRIOR REMOVAL. PIPING SHALL BE STOCKPILED ON-SITE PRIOR TO DISPOSAL. RIPON, CA 953roro
<br /> 1. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING CLASS RATING OF 2-A,20-5:G WITHIN 50 FEET OF THE OPERATION. TO TESTING. APPLY 4 RELEASE PRESSURE SLOWLY. VENT/VAPOR SYSTEM DUE NOT INDUCE AIR OR WATER INTO THE EXISTING TANKS. (209) 599-4201
<br /> COURSE PRIOR TO THE START OF WORK. CERTIFICATION OF THIS MUST BE SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(S), EXTRACTOR
<br /> PROVIDED TO THE OWNERS ENGINEER PRIOR TO THE START OF WORK. 11. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY BASE AND RISER, STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR VISUALLY INSPECT PIPE AND TRENCH FOR INDICATION OF LEAKAGE. A BAN JOAQUIN COUNTY
<br /> MEMBERS OF U.S.A. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING LINES TO ISLANDS AND STAGE II FLEX CONNECTORS AT DI5PEN5ER(W. SOIL SAMPLE SHALL BE TAKEN AND ANALYZED AT THE ENDS AND AT APN 259-0130-21
<br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM LEAST EACH TWENTY LINEAL FEET OF TRENCH, AND WHERE INSPECTION
<br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH 1994 CALIFORNIA UST NUMBER (800) 221-2600. D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM t0 50 OF TRENCH OR PIPING REVEAL EVIDENCE OF LEAKAGE.
<br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED 70 OWNER PSI. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS.
<br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST CORRECT ANY LEAKS AND RETEST. IF INSPECTION REVEALS EVIDENCE OF LEAKAGE, IT SHALL BE
<br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PETROLEUM WORK SCOPE DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE.
<br /> OWNER E. SLOWLY RELIEVE PRESSURE FROM VAPOR/VENT SYSTEM AND REMOVE �,I ALTON
<br /> I. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK SCHEDULE THAT ALLOWS THE SITE'S STORE TO REMAIN OPEN TO THE PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING IS JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. '' � Y NGINEERING, INC.
<br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 1994 FULLEST EXTENT POSSIBLE. COMPLETE. SAMPLES SHALL BE TAKEN USING A DRIVEN-TUBE TYPE SAMPLER,
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN- '1
<br /> 2. FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP F. SECONDARY PIPE MUST BE PROPERLY CUT. INSPECT ALL PRIMARY OF-CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND
<br /> 4. CONTRACTOR SHALL HAVE THE FOLLOWING LIGENSES: OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY PIPE SURFACES. PRESSURIZE SECONDARY PIPE TO 5 PSI AND SOAP ALL SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY,
<br /> SECURE FENCING PANELS TOGETHER PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY II BOX 1025
<br /> A. GENERAL ENGINEERING "A" SPACE GHALL BE MAINTAINED UNTIL AFTER THE PAVING IS IN PLACE OVER A. THE ENDS OF THE BRASS TUBE SHALL BE COVERED WITH Al-UMINUM 843 RISKS LANE
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING ("HAZ") 3. FLUSH, CUT, AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO TANK FIELD AND PIPING RUNS, AND SHALL BE WITNESSED BY THE OWNER'S FOIL, THEN PLASTIC END CAPS, AND FINALLY WRAPPED WITH A SUITABLE WEST SACRAMENTO, CA 95691
<br /> DISPENSER ISLANDS. REPRESENTATIVE. TAPE. (91(o) 312-1888
<br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL FAX 313-1112
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER 4. REMOVE ALL EXISTING FUEL DISPENSERS, ISLANDS, BARRICADES, FUEL G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE B. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE,
<br /> AS "ADDITIONAL INSURED". LINES, ASPHALT AND CONCRETE SURFACES AS REQUIRED, IN PRESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER FOR TRANSPORT TOA LABORATORY. FORMAL CHAIN-OF-CUSTODY
<br /> PREPARATION FOR INSTALLATION OF NEW AS SHOWN ON DRAWINGS. ANY PAVING IS IN PLACE RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE. THESE pMENTS s OF SERVICE,
<br /> THE s
<br /> A. STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY PRIN6OPERTY
<br /> 01 WALTON ICE,REFIAN , INC.j PROPERTY OF WALTON EWaINEERN6, IN
<br /> j OWNER REPRESENTATIVE. 15. G.G. SHALL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAVING C. IF THE BOTTOM OF THE TRENCH IS BELOW THE GROUNDWATER TABLE, AND SHALL NOT BE L6ED FOR ANY WRPCSE
<br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE 15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION SOIL SAMPLES ARE NOT REQUIRED. IN THI5 CASE, A WATER SAMPLE OTHER THAN THOSE FOR WHICH THET HAVE
<br /> D.
<br /> LIMIT OF NOT LE55 THAN $1,000,000 PER OCCURRENCE FOR BODILY 5. OWNER WILL CONTRACT WITH AND FURNISH CONSULTANTS TO PERFORM SOIL LINE TEST SHALL BE IN ACCORDANCE WITH NEPA 329, LOCAL SHALL BE COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF BEEN SUPPLIED BED OR REPRODUCED,
<br /> CESE DRAWINGS
<br /> SHALL UP BE REPRPREAR COPIED D TRACED
<br /> INJURY AND PROPERTY DAMAGE. ANP/OR WATER TESTING UPON PIPING REMOVAL IN ACCORDANCE WITH REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A THE GROUNDWATER IN THE EXCAVATION. A CHECK SHALL INITIALLY BE WITHOUT THE E>FRESS WRITTEN CONSENT OF
<br /> PIPING REMOVAL PLAN AND LOCAL REGULATIONS. (ALLOW TWENTY-FOUR CERTIFIED TESTER G.G. SHALL PROVIDE WRITTEN REPORT OF PRECISION MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 15 WALTON ENGINEERING,INC.
<br /> G. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED HOURS FOR RESULTS OF SOIL SAMPLES.) TEST TO OIUNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF DETECTED, THEN A WATER SAMPLE SHALL SE TAKEN WITH A DEVICE COPYRIGHT O 1996
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY PROJECT. DESIGNED TO REDUCE THE LOSS OF VOLATILE COMPONENTS. A BAILER
<br /> OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND 6. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON, AND SHALL COVER WITH, 15 A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE SHALL BE
<br /> PROPERTY DAMAGE. 4 MIL. PLASTIC UNTIL SOIL 15 REMOVED, ANY SOIL TO BE STOCKPILED ON 16. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRESSURE IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL
<br /> SITE FOR SAMPLING PRIOR TO OFF-HAUL BY OTHERS AS DIRECTED BY TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE DRAW BY MEL
<br /> 6. GENERAL CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND OWNER USED TO SEAL THIS VIAL.
<br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE 11. CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL CHK[)' BY RJH / MK
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR 1, OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF ALL REGULATIONS. SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL
<br /> REQUIRED BY THE DRAWINGS. EXCAVATED SOIL AFTER COMPLETION OF ANY NECESSARY REMEDIATION, HYDROCARBONS BY THE METHODS OUTLINED IN "GUIDELINES FOR DATE 21 APR 98
<br /> INCLUDING AERATION. 10. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. ADDRESSING FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY
<br /> 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM CONTROL BOARD, SAN FRANCISCO BAY REGION - SEPTEMBER 1985."
<br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, 8. IF REQUIRED, BACKFILL THE ABANDONED TA\K HOLE ONCE ALL SAMPLING 19. BRAVO BOXES, TURBINE SUMPS, AND OVERFILL BOXES ARE TO BE SCALE FULL
<br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA AND/OR OVER-EXCAVATION IS COMPLETED, USING SUITABLE MATERIAL. FILL COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY OWNER'S
<br /> CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, SHALL BE COMPACTED A MINIMUM OF 90% ,ODIFIEp PROCTOR VALUE TO W/IN REPRESENTATIVE AS FOLLOWS:
<br /> JOB NO. 43630
<br /> OR COUNTY ORDINANCES. 3 FT. OF FIN. GRADE AND 95% MIN. FOR REMAINDER G.C. SHALL PROVIDE
<br /> SOILS ENGINEER WHO WILL SUPERVISE THE PROCESS AND CERTIFY THAT THE 1. FILL WITH WATER TO HIGHEST PENETRATION.
<br /> 1 8. PERMITS TO BE SECURED BY OWNER AND SUPPLIED TO CONTRACTOR HOLE WAS COMPACTED PROPERLY. MINIMUM TESTS SHALL BE AT 5', 3', AND 2. SPRAY PAINT TOP OF WATER
<br /> CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT 1' BELOW FIN. GRADE, FOR A MINIMUM TOTAL OF THREE COMPACTION TESTS. REVISIONS
<br /> CONDITIONS. PROVIDE RESULTS TO OWNER'S REPRESENTATIVE W/IN 15 DAYS. 20. PROVIDE AND INSTALL CONDUIT 4 WIRING FOR PETROLEUM 5YSTEM(5) AND DATE REV DESCRIPTION BY
<br /> CANOPY LIGHTING. PROVIDE CONDUIT FOR FUTURE CARI7READER5 AND
<br /> 9. GENERAL CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OF 9. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW EQUIPMENT. OTHER SITE ELECTRICAL AS INDICATED ON THE DRAWINGS.
<br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID.
<br /> 10. INSTALL "TYPAR" FILTER FABRIC LINER PIPING TRENCHES, PER DRAWINGS, 21. ALL CONDUIT IS 70 BE 3/4" (MINIMUM) RIGID CONDUIT.
<br /> 10. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO WHERE REQUIRED BY WET-HOLE CONDITIONS.
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR 22. INSTALL MONITORING SYSTEM WITH INTERSTITIAL PROBES, TURBINE SUMP
<br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY 11. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT L15T INCLUDING PROBES, AND TANK GAUGES, AND MONITOR CONTROL PANEL IN BUILDING
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOK5 SALVAGEABLE EQUIPMENT TO BE REINSTALLED, IF ANY, AND PROVIDE AND PER DRAWINGS.
<br /> OPERATIONS. INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE
<br /> PETROLEUM SYSTEM. 23. INSTALL NEW DISPENSERS, AND CONTROL EQUIPMENT AS INDICATED ON _
<br /> 11. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND SITE PLAN AND DESCRIBED IN THE EQUIPMENT LIST.
<br /> STATE REGULATIONS. THE CONTRACTOR 15 REFERRED TO THE OSHA 12. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY 24. INSTALL SITE LIGHTING, IF APPLICABLE, AND / OR ANY OCHER ITEMS A5 --
<br /> BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S
<br /> PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE SHOWN ON THE DRAWINGS.
<br /> PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS - -
<br /> 12. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP IS COMPLETED. 25. INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE AS
<br /> "AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS GUILTS" INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM
<br /> ! SHALL BE COMPLETED ON-51TE WITH INFORMATION NOTED DIRECTLY ON A: PRODUCT PIPING: 2" PRIMARY PIPING WITH 3" CONTAINMENT SYSTEM COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 1=51. CONCRETE SHALL C
<br /> APPROVED JOB COPY. AS APPROVED BY OWNER ALL PIPING AND CONTAINMENT SYSTEMS SHALL CONTAIN 1 POUNDS OF LAMPBLACK PER CUBIC YARD - USE DAVIS 8084. SHEET TITLE
<br /> BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL
<br /> 13. CONTRACTOR SHALL PROVIDE A LIST OF 51,15-CONTRACTOR6, IF ANY, WHO BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVES 26. REPAIR AND/OR REPLACE A.G. PAVING AND BASE TO MATCH ORIGINAL IN
<br /> WILL BE USED ON THE PROJECT. AND / OR FITTINGS. AREAS DISTURBED BY WORK. GEN.
<br /> N. N ®TGCS ,
<br /> 14. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND B: VENT / VAPOR PIPING: RED THREAD IIA AND RED THREAD II WITH 21. ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK �7 G SCOPE ,
<br /> � 9
<br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES FITTINGS AND 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY SHALL BE DONE ON A TIME AND MATERIALS BASIS. RENTAL RECEIPTS,
<br /> REQUIRED TO RUN THE FACILITY. 3000L WITH ALCOHOL FITTINGS AND RP45 ADHESIVE. DO NOT MIX SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS, AND DAILY LABOR TIME PIPE
<br /> 'P REMOVAL
<br /> j MANUFACTURER'S MATERIALS. SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND
<br /> MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY.
<br /> G: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAYING BEEN
<br /> TRAINED BY MANUFACTURER