Laserfiche WebLink
5 . ) Water Not Present Tn Tank Pit : <br /> Tank Size ( A ) 0 to 1 , 000 gallons a minimum of one soil <br /> samples will be taken from either the pump <br /> or the fill end of the tank , below bottom of <br /> tank . <br /> ( B) 1 , 001 to 10 , 000 a minimum of two soil samples <br /> will be taken . One sample from each end of <br /> the tank , below bottom of tank . <br /> ( C ) 10 , 001 and up a minimum of three soil samples <br /> will be taken spaced evenly along the length <br /> of the tank , below bottom of tank . <br /> b . ) Water is Present In Tank Pit : <br /> Tank Size ( A) 10 , 000 gallons or less ( single tank) the <br /> minimum number of soil samples will be <br /> two from the tank wall at each end of <br /> soil /ground water interface . The minimum <br /> number of water samples shall be one . <br /> ( B) 10 , 001 and larger tank , or a cluster of <br /> tanks the minimum number of soil samples <br /> to be taken shall be four , one from each <br /> wall at soil/ground water interface . A <br /> minimum of one water sample shall be taken . <br /> CHEMICAL SECTION : <br /> 1 . ) Contents of Tank : Previously three tank held gas . The oil <br /> tank is the reservoir for a hydraulic <br /> lift . <br /> 2 . ) Residual : All tanks will be emptied by owner prior <br /> to start of job . <br /> 3 . ) Authorization : To release soil analysis form is <br /> attached . <br />