Laserfiche WebLink
STATE OF CAUFORMA <br /> s <br /> STATE WATER RESOURCES CONTROL BOARD iA <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ( 1 NEW PERMIT ❑ 3 RENEWAL PERMIT5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ 6 TANK REMOVED la <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: C QN USN GJ2-I 133M A!" 4�n <br /> 1. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.a 3 B. MANUFACTURED BY: =0 -4 <br /> C. DATE INSTALLED(MOIDAYNEAR) 5 D. TANK CAPACITY IN GALLONS: 2, <br /> ILTANKCONTENTS IF A4 IS MARKED,COMPLETE ITEM C. <br /> A ` 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ® 1aUNLEADED <br /> N EA ED B REGULAR 3 DIESEL ❑ 8 AVIATIONGAS <br /> v❑' 2 PETROLEUM ❑ 90 EMPTY 1 PRODUCT ❑ 1DPREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> UNLEADED 5 JETFUEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOWI <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.v: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL 3 FIBERGLASS ❑ 4 STEEL CUD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM B 10D% METHANOL COMPATIBLE WIFRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ® 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> J935- <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION AU 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALLU 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A {lD B 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U D5 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ® 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING 3IMONORING <br /> NTERTITIA ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ® 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ® 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING © 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION Y <br /> 1.ESTIMATED DATE LAST USED(MO/ AY/VR) 2. ESTIMATED QUANTITY OF /� R GALLONS 3 WAS TAN MATEFILLED <br /> WIITH YES ❑ NO ❑ <br /> A <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPL ICANTSNAMECLW DATE <br /> (VRIHTEDA SIGNATUREI 29 G <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW i rj <br /> COUNTY# JURISDICTION FACILITY# TANK# <br /> STATE I.Dl m <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WIT*LOCAL AGENCY IMPLEMENTING THE UNDERGROUND SOGE TANK REGULATIONS <br /> FORM B (1291) �_il / -q'6 ORW71LRf <br />