Laserfiche WebLink
Chevra roducts Company <br />Underground Storage ank Alarm Reporting Procedure• <br />Alarm Test Key <br />Liquid Crystal Display <br />(Sho,lno normal oyer <br />MMM DCI,.YYYY HH;MM lC1Yt <br />ALL FUNtftN& NUitMAL , <br />ALARMalarm Indicator Wght <br />WANNfNO 5 ' <br />WarninghsNcator Light <br />POWER) <br />Power Indicator Light <br />Operating Keys Alphanumeric Kala <br />In Case of Alarms or other Fail Conditions <br />Follow the steps listed below: <br />Step 1: Pass the LLAWATEST 23 to Silence tate Alarm. <br />Step 2; lmnlediately Report the ALARM CONDMON to your <br />Station Manager and/or Dealer <br />CONTACT NAME <br />TITLE <br />Primary Phone R <br />Secondary Phone 0 <br />t) ny/N/ i? qie <br />tA16 <br />- . 7 <br />_► aI/ <br />&z -R <br />M, <br />d7G/2 <br />Step 3: Station Manager and/or Dealer. Within 24 boars of the /sibs/ alarm <br />Notify Chevron NUinteluwace —Solve One Help Desk at 1$66- 8464264 <br />Step 4: Follow the documentation procedures as described on your <br />UST EQUIPMENT MONITORING LOG and SUSPECTED LEAK ACTIVITY LOG <br />For Posting at your Monitoring System Panel <br />Note: Cali£mnia VST System Designated Operaw regulation requires a) aaibting employees be Trained on these p(aedures by July <br />1, 2005 and a)) new employees hired atter this date within 30 days of hire and annually thereafter. Document this taming using the <br />Chevron Products Company Underground Smwge Tank Alarm Reporting Pracedme Employee Twining Log. <br />