Laserfiche WebLink
SS <br />Mw <br />EXISTING TO REMAIN <br />EXISTING TO BE REMOVED <br />STORM DRAIN <br />SANITATION/SEWER <br />EXTENT OF' EXCAVATION <br />MONITORING WELL <br />(TYPO) <br />LOCATIONS OF EXISTING MONITORING WELLS AND <br />MONITORING EQUIPMENT ARE SHOWN FOR <br />CLARITY. GC SHALL VERIFY EXACT LOCATION, <br />QUANTITY & TYPE PRIOR To COMMENCEMENT <br />OFWORK. <br />SHEET <br />1 UST REMOVAL PLAN <br />PR04JECT NAME- CHEVRON STATION #9-1452 <br />BULDING CODEE0 <br />2007 California Building Code (based on 2006 International Building Code) <br />2007 Califorrilia Mechanical Code (based on 2006 International Mechanical Code) <br />2007 California Plumbing Code (based on 2006 Uniform Plumbing Code) <br />2007 California Electrical Code (based on 2005 National Electrical Code) <br />2007 California Fire Code (based on 2006 International Fire Code) <br />2006 International Property Maintenance Code <br />SCOPE OF WORK <br />A� PROVIDE 6' CHAIN—LINK FENCE AS SHOWN ON SITE PLAN FOR DEMOLITION AREA PRIOR 'TO <br />COMMENCING WORK. <br />B. REMOVE EXISTING DISPENSERS AND DRAIN PIPES BACK TO UNDERGROUND STORAGE TANKS. <br />REMOVE UNDER—DISPENSER CONTAINMENT & ASSOCIATED PIPING. <br />C. TRIPLE RINSE & INERT UNDERGROUND STORAGE TANKS AND PIPES PRIOR TO ANY DEMOLITION <br />WORK, <br />D. <br />REMOVE <br />N <br />E, <br />CUT AND <br />REMOVE EXISTING CONDUITS AND CONDUCTORS, <br />F. <br />REMOVE <br />� <br />PIPING, <br />G. <br />EXCAVATE AND REMOVE EXISTING UNDERGROUND STORAGE 'TANKS & ASSOCIATED PIPING <br />H, <br />LOAD TANKS ON CHEVRON APPROVED CARRIER FOR TRANSPORT' TO AN APPROPRIATE TSD. <br />T <br />REMOVE <br />EXISTING VENT RISERS & ALL ASSOCIATED PIPING. <br />Jw <br />REMOVE <br />EXISTING HOISTS AND ASSOCIATED EQUIPMENT, <br />K� <br />BACKFILL <br />& COMPACT ALL EXCAVATIONS To 90% RELATIVE DENSITY. <br />LM <br />PROTECT <br />SITE <br />CONSTRUCTION. <br />M. <br />IF SOILS <br />OR BACKFILL MATERIAL ARE TO BE STORED ON SITE, THE MATERIALS MUST BE SET <br />ON AND <br />COVERED WITH VISQUEEN. SAMPLE FOR REUSE OR DISPOSAL. <br />a <br />E ?v! �rl I i I <br />7µ C 5a <br />SS <br />Mw <br />EXISTING TO REMAIN <br />EXISTING TO BE REMOVED <br />STORM DRAIN <br />SANITATION/SEWER <br />EXTENT OF' EXCAVATION <br />MONITORING WELL <br />(TYPO) <br />LOCATIONS OF EXISTING MONITORING WELLS AND <br />MONITORING EQUIPMENT ARE SHOWN FOR <br />CLARITY. GC SHALL VERIFY EXACT LOCATION, <br />QUANTITY & TYPE PRIOR To COMMENCEMENT <br />OFWORK. <br />SHEET <br />1 UST REMOVAL PLAN <br />PR04JECT NAME- CHEVRON STATION #9-1452 <br />BULDING CODEE0 <br />2007 California Building Code (based on 2006 International Building Code) <br />2007 Califorrilia Mechanical Code (based on 2006 International Mechanical Code) <br />2007 California Plumbing Code (based on 2006 Uniform Plumbing Code) <br />2007 California Electrical Code (based on 2005 National Electrical Code) <br />2007 California Fire Code (based on 2006 International Fire Code) <br />2006 International Property Maintenance Code <br />SCOPE OF WORK <br />A� PROVIDE 6' CHAIN—LINK FENCE AS SHOWN ON SITE PLAN FOR DEMOLITION AREA PRIOR 'TO <br />COMMENCING WORK. <br />B. REMOVE EXISTING DISPENSERS AND DRAIN PIPES BACK TO UNDERGROUND STORAGE TANKS. <br />REMOVE UNDER—DISPENSER CONTAINMENT & ASSOCIATED PIPING. <br />C. TRIPLE RINSE & INERT UNDERGROUND STORAGE TANKS AND PIPES PRIOR TO ANY DEMOLITION <br />WORK, <br />D. <br />REMOVE <br />DROP TUBES AND ASSIST CLIENT'S CONTRAC-TOR TO REMOVE PRODUCT FROM TANKS. <br />E, <br />CUT AND <br />REMOVE EXISTING CONDUITS AND CONDUCTORS, <br />F. <br />REMOVE <br />EXISTING 'TANK SLAB & EXISTING DRIVE SLABS AS REQUIRED 'TO REMOVE TANKS Sc <br />PIPING, <br />G. <br />EXCAVATE AND REMOVE EXISTING UNDERGROUND STORAGE 'TANKS & ASSOCIATED PIPING <br />H, <br />LOAD TANKS ON CHEVRON APPROVED CARRIER FOR TRANSPORT' TO AN APPROPRIATE TSD. <br />1. <br />REMOVE <br />EXISTING VENT RISERS & ALL ASSOCIATED PIPING. <br />Jw <br />REMOVE <br />EXISTING HOISTS AND ASSOCIATED EQUIPMENT, <br />K� <br />BACKFILL <br />& COMPACT ALL EXCAVATIONS To 90% RELATIVE DENSITY. <br />LM <br />PROTECT <br />ALL EXISTING MONITORING WELLS, REPAIR OR REPLACE IF DAMAGED DURING <br />CONSTRUCTION. <br />M. <br />IF SOILS <br />OR BACKFILL MATERIAL ARE TO BE STORED ON SITE, THE MATERIALS MUST BE SET <br />ON AND <br />COVERED WITH VISQUEEN. SAMPLE FOR REUSE OR DISPOSAL. <br />1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING 5 --DAY UST CLOSURF NOTIFICATION TO THE <br />BAY AREA AIR QUALITY MANAGEMENT DISTRICT (REG. 8, RULE 40, <br />2, CONTRACTOR IS RESPONSIBLE FOR CONTACTING UNDERGROUND SERVICE ALERT (USA), <br />1-800-227-2600 OR 811 AT LEAST 2 WORKING DAYS PRIOR TO THE START OF WORK. <br />3, SECURE OPEN EXCAVATION AGAINST STORM WATER RUNOFF, TEMPORARILY STOCKPILED SOIL <br />STORED ON SITE SHALL BE PLACED ON AND COVERED WITH VISQUEEN, <br />4, REMOVE & CAP EXISTING UTILITY SERVICES (GAS, ELECTRIC, WATER, SEWER) BACK TO <br />PROPERTY LINE OR AS DIRECTED BY CHEVRON ENGINEER. <br />5, CONTRACTOR SHALL REMOVE AND SALVAGE EQUIPMENT SPECIFIED BY THE CHEVRON <br />REPRESENTATIVE AND DELIVER SUCH EWIPMENT TO A LOCATION SPECIFIED. EQUIPMENT 'TO <br />BE SALVAGED IS TO HAVE EQUIPMENT NUMBERS RECORDED ON FORMS PROVIDED BY THE <br />CHEVRON REPRESENTATIVE. PLUG ANY OPENINGS IN SALVAGED DISPENSERS. At,,.L OTHER <br />EQUIPMENT 'TO BE SCRAPPED, RECYCLED TO THE MAXIMUM EXTENT POSSIBLE. <br />6. CARE SHALL BE TAKEN TO PROTECT ADJACENT PROPERTY AND STRUCTURES DURING <br />DEMOLITION AND EXCAVATION. <br />7, WHEN PARTIAL DEMOLITION IS SPECIFIED, CONTRACTOR SHALL PROTECT ALL EXISTING <br />FACILITIES, BOTH PUBLIC AND PRIVATE, WHICH ARE TO REMAIN, CON -TRACTOR WILL <br />COORDINATE APPROPRIATE TRADES TO ASSURE THAT THE PORTIONS REMAINING SHALL REMAIN <br />USEABLE FOR THEIR INTENDED PURPOSE, CONTRACTOR SHALL REPAIR OR REPLACE, TO THE <br />OWNER'S SATISFACTION, ANY EXISTING FACILITIES WHICH ARE DAMAGED AS A RESULT OF <br />CONTRACTOR'S OPERATIONS, <br />8, CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL ENCROACHMENT PERMITS IF WORK IS TO <br />OCCUR WITHIN 'THE PUBLIC RIGHT—OF—WAY. CONTRACTOR MUST PROVIDE PEDESTRIAN AND <br />TRAFFIC PROTECTION IN ACCORDANCE WITH CODES AND LOCAL ORDINANCES. <br />9, IF ANY HAZARDOUS MATERIALS ARE DISCOVERED DURING DEMOLITION ACTIVITIES, CONTRACTOR <br />IS RESPONSIBLE FOR IMMEDIATELY NOTIFYING THE CHEVRON REPRESENTATIVE. REMOVAL OF <br />HAZARDOUS MATERIALS WILL BE COORDINATED BY CHEVRON REPRESENTATIVE IN <br />ACCORDANCE WITH CHEVRON SPECIFICATIONS AND LOCAL AGENCY REQUIREMENTS. <br />10. CONTRACTOR SHALL COORDINATE AND OBTAIN ALL REQUIRED TESTS, INSPECTIONS AND <br />SIGN—OFFS AS REQUIRED, ADEQUATE NOTICE SHALL BE GIVEN PRIOR TO INSPECTIONS. <br />PROVIDE COPIES OF TEST RESULTS TO OWNER AND REGULATORY AUTHORITIES. <br />11, ALL. TRENCHES IN 'TRAFFIC AREAS, INCLUDING PEDESTRIAN TRAFFIC ARE -AS, SHALL BE <br />COVERED WITH TRAFFIC—RATED PLATES WHEN WORK IS NOT IN PROGRESS. TRENCH <br />CROSSING MUST BE IN COMPLIANCE WITH JOSHUA SPECIFICATIONS. <br />12, EDGES OF EXISTING PAVEMENT, CONCRETE SLABS, CONCRETE CURBS AND SIDEWALKS <br />SHALL BE NEATLY 'TRIMMED, CONTRACTOR SHALL SAWDUST EXISTING PAVEMENT, SLABS, ETC. <br />IN NEAT STRAIGHT LINES AS NEEDED. <br />11 OVERESTIMATION & DISPOSAL OF CONTAMINATED SOILS WILL BE AT THE DIRECTION OF THE <br />CHEVRON ENC REPRESENTATIVE, DISPOSAL SITE SHALL BE APPROVED IN ADVANCE BY THE <br />CERTIFIED UNIFORM PROGRAM AGENCY (CUPA). <br />14� ALL DEBRIS AND ACCUMULATION OF MATERIAL RESULTING FROM DEMOLITION ACTIVITIES SHALL <br />BE REMOVED FROM THE PREMISES. RECYCLE TO MAXIMUM EXTENT POSSIBLE, PROOF OF <br />RECYCLING MAY BE REQUIRED, <br />15. DEMOLITION OF 'THE FORMER TANK EXCAVATION SHALL BE IN ACCORDANCE WITH THE <br />PROCEDURES OUTLINED IN 'THE CHEVRON SPECIFICATIONS, COMPACTION TESTING AND <br />CERTIFICATION ARE REQUIRED IN ACCORDANCE WITH THE PROJECT SOILS REPORT. ALL <br />BACKFILL., COMPACTION AND TESTING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />16. CONTRACTOR IS RESPONSIBLE FOR APPROPRIATE BEST EROSION CONTROL PRACTICES. <br />COMPLY WITH ALL REGULATION, LAWS, ETC, <br />17, CHEVRON STANDARD IS TO SCARIFY LOT TO -3' AND RECOMPUTED TO 90% RELATIVE <br />DENSITY. <br />I <br />H <br />