Laserfiche WebLink
. ......... . ..... <br />1 7� -7 r= 777--'-----, "77,,7,77 <br />7 <br />17 <br />2 3 44 5 10 11 12 14 as' 10 J, <br />rJUMMM, ==WW=15=rr=%"=T1M========== <br />MMORANZIMMMM <br />04 DOUBLE WAL.L. FRI"I INS"FALLATION TANK rE'5flNG <br />05 TANK HOLT-DOWN 1NST/A[,_1,.AT10N 0 6 P/TTC H PAVING AND CONCRETE WQF140 <br />9 PRE-INSTALLAnON ITST SET UFO Prior to the pre -Installation test, all sh�pp�nq pods roust GENERAL REQUMEMENTS: Anchor c1l undergrcu�nd stor trjr)ks with concrete hold-downs <br />hANTEFFIAL& Double, -Wall fiberglass Wnforced plostic (FRP) storoge tonks (,,)F, supplied by Chevron be removed Boni Te tank and the vocuum on the annular sp,,xe must be ("lcgi' or deadmen") when specified by Cor�,pony Rejl�,?,`Ithe Scope of Work, Refer to dr , owing SCOPE OF' WORK� <br />me to be KstaHed by Contractor in accordance with the p�ans ond 15pecificaflon�,,,, �W F- 10 (N - 11 F -T- - F 10 - 5), <br />A vacuuni on the unnuWr space h not a subs0tute for the pre- i nstal lotion test, AH irstoHotion Potch Pavinq� Patch poving work applios to minor work in connection with covering of p1pe <br />tests niust be performed and recorded on company suppfled forms, 'Tonk bedding, t�aHostirng and tank hole backfM procedures are descfted under Section 02 of these trennhes, areas Qacent 5 tonk tab and other areos disturbed during' tank installoti6n. <br />Double Wall Double YAH specHations, <br />10 TANK TESTING - lNSTM,JCTIONS� <br />Concrete: Concrete rvork appHes to istalling tank slo <br />repak of We slobs and othd areas <br />The tank onchoncige systern shown on the circiwings is designed for a moximunn level cq ground w9ter distributed duhng tonk �nstnHotion, Rofer to opplicob!e droMrIg' F-4 or F--7 <br />15000 21 - 5 - 3/1' L 'ong General: Notify Cornpnny Representat�ve, who MUST observe all tests, at least 24 hours equo� to the suborade �eveL for slab deta& <br />10' - 4" 6 �15, in advance of nny test, <br />12000 3T - 0 -1 IV' Lono 3 (Y 3" Long MATERIALS: <br />8' (f O�D� 1 O'D, rhp pressum uppkation systern is to have two pressure gauges;(range 0 to 10 psi with 5 <br />10000 3 1' 6-,1/2" Long 303 q Qng pw pasnae Kok) in thi systenn, both in good candi6c)6 orid oving been tested ond 1. CONCRE�'E HOLD-DOWN& Pre-cas[ ro�nfe,,,�rced concrete 0age 12" a 12" or 1,21 x 18"'j'A <br />81 1. /2" (11D� <br />81 (f (TET cWhrAed within a three-manth period rkior to the tank test (copy of Se test ond cross-seckn, with charnfued edges Length, slr;c,�',n ;A Ohs hwerAgs, 1121 "dinneter <br />1 1000 IV 4- 1 /1' Long 1 6-1/8" Long cW10% d5a to be furnk3hed to the Company Representotive upon requ,�­4,t), ga�vanized stee� c4nchor �oops are to be r: ", ast into "logs " at Nations hown,'' 11 P , r C s t rn ri a I <br />4' 0, D, 4" J- 1 47 0, D, shaH have achieved Rs Wtimate compoessive skength of 2500 psi (2,8 daye)�,�r'�6r <br />USE EXTREME CARE AROUND A14D NEAR THE Pl`?,,E5SURlZED TANK, Reheve <br />(Notc CID. J over the %) 07 APPROVED MATERIALS <br />the pressure prior to rnroving the tank or rerroWng any of Te AtUngs, Pre -cost concrete fourWadon ples which meet cw exceed above specificofloKs, dre, actept,6b�e,, <br />DO NOT inskoH a tank witch shows any evidence; of feak�ng rhe Company Representative 2, WIRE ROPE CAMS: Hat­d�p g�,,flvanlized steel vire ropo, ryiln4n�)ni 11/2" diarAtekhre6kino <br />rhe contractor will furnish the exact hordware �isked on the Bill of M�,,,Aeriois unless otherwise 1 to be noNed and wil deeurhe the cowse of oction that wdl be followed, strength, 20,4K, APPROVED BACKFILL vArEWALS� <br />q <br />specified by the Cornpany Rep, The Contmctor is lespcoisible for 0 labor', rnateriai ond (4, 'uipment neces�sory to Conduct <br />the following %Q 3, �IARDWARE; Cable clamps, coWe guides, guords, eta shoH be hot -dip gcflvonized' stetfl� 1� P F)N G, MMI L A clearh naturalygounded aggegWe with a 1/8" minirnum and a 3/*' <br />Other Contractor suppHed eqWprnent inch,.�des: vapor recovery (when specMed) Phase I Assernbliew <br />Arlopters, dLASt caps and normeplate �,m�ders, Phase I Eqdprnenh Ant! - hiec� irc kilo tion volve, high hose Pre­�w,,,,,,tolicition Pressure Test, Air moximurn d�arneter, Up to 31% f the parUc es may pass through a #8 steve, <br />retractor, nozzle swNels, flow Hmiter, anti -kink springs, swiQ stops, clarnps, extension, Post-lnstaHaHon Pressure rsst, Air or Hydrostatic 4, PROTECTVvE COA,pNG� P6or to backfHrv,') tonks, oppiy a qenerous quantit, o Ch, rph <br />K ',A f O� 2b STONE OR GRAVO_ CI�USHIN(�S, 'Noched mdedO, Mth pqrtic�e s�ze bebveen 1/8" and <br />Ampholt Coating" by bush to aH exposed steel cables, �oops dnW hardware. 1/2 "� Up to 3% of the porkles may pois through o 8 5ieve, <br />(Ot the submeMed chop tube for product and heaUng fuel tonks of a 45' on��,k, so the lowest point L ACCEPTABLE SOAPS, WoopkAf the tank mHor and NtAings uYng a srnoll garden- # <br />YA1 be T (Hoki true) frorn tho bottorn of the tank The highest pAnt amst im a type hand -pressurized spro"Y muli, rhe test,soop shad be a hitih foam�ng "soap" that �NSTIALLATION PROCEDURE� Approved matedWs crust be dry, free of A and snow, ond meet A TNA (C-33, Pora, 7,11 fo,r quafity�_ <br />maximum of 6" frorn the bottcon of the tank The 6" rnoxin�urn d�mencion �s critkri� du�e to air 0bbles easHy if in contact" vAh an A Wak 0 the tank but won t bW,,:�ble d�,,�e to and soOndness, The dry gravel dens�ty must be o rninimurn of 911, pounds per cubic foot <br />quality ruies.-"Ment Te subawrged dmp tut)e to direct incom�ng pnodu�c,,t toword the opposite end dispensinq frorn the pressure opplicator, Acceplabde soops ore! 1� F1reP(,,)re the tank hole to recebe hof? -down AgA Install thodng (or side Appy) K <br />of the tank. Refer to instalAtki drawings for ad01ona� detc0s, accordance w1h SecCon 02, 'TANK HOLE iJNER: Conlador is to provide a Mer Fabric Tonk Hoki Uner whm, <br />"Seorn "Fest Concentrat%,� <br />1 , HANDLING: The Controctor is re3pona ble for off-ka&ng the tonks from the de6very vehkle, MWO Loc High Soop 2, Purnp the woter out of the t�,,7,nk ho!e, Keep wNer out of the took hole LTMH" tnn�s hove a) Tank ho�e is in unstoWe soil, or <br />A crone or backhoe of mANcient WUng rapa0y must E,�e usk",�,d, The weight of the douWe woH 5outhbend Leck Detector" been sK 6ed down, ballosted eond backfilled, <br />FRP tank is approxirnate�y 5000 - 6000 lbs, dr opproved equo� <br />h b) SpecMed by Company Rep, The Mq Wnk holo (sides and bottorn) shall be covered, 1,.,Cjy <br />1 insert each cobka through its own anchor �oop wi t e loi� xsenring, suMent cable to that the fribric wRh 2 foot minimufn ove0aps, <br />2. LIFING ck 14OMNQ When lifth g or nioving an FRIP tonk, a�rvayF, t�s�D properly s�zed iL PRE,­INSTA� �,APQN PRESSURE TEST, AN: Use extrerne� cgre around and near both (irids of the cabi wM be kept at Me top of the to k hole '6f ter, tho, " lQ( r <br />a 0 s <br />equipment and Sit by Wrmt Qs(s). On lorge b,'inks, greater than 8' dwrneter, use a spreader any ywessuNed tank. Never prMUNZe seconday (outer) tank vithout pre,,,�Surifng Lowa and poslon the "Fog? 0 the tank hoW keeping hath ends of the qobWi at the tf:')p Beddng indericA, tie -d I ond sample wels are to be placed on the top of Me fiRer <br />bar to enswe a fft 'ang�e 'bf (it Wost 45 deqree-� at, e " -,Ich fiftig lug, the pdrnary (inner) tonk, of the hoie. InstaN the It' adniniurn thick beddng maNdal in tonk Sruooth drid own OgS <br />< slope per Te tank bedd�n,,j instructions, f6brIic, Excess faNk at the top of Ow hWe should be h0ded over the backnH nnoterial of <br />subgrode �eyef, <br />Never roll or use cobfes or chaRm around an FRP tcink, Set on smooth ground, free of rocks A.Primory (�nner) rank Te�at: Locote o prescure gouge in the vent/monitor fitting j <br />and f�,reiqn objecAs. �n the soconda, (Mdw) tank, Locote a second pr�,,,ssuro gouge at the FiH 6pening C Pioceed with setting th; tanks by adding boHast os neceslay to Ank'Andleop ddwn the, APPROOED F�LJER FAFMC MATEMAL� A <br />and connect the air pressury to this IRSIg, tcnkt,,��, Use 01 enough b0ost to hoW the tanks down unbl the MAN A 606 with the <br />Exaptiom FRP Tonf may be r5led up to 90 degrees on a srnooth clean surfa<:e when performing top of the tanks� (Refer to SecUon 04 for tank setting requiren%k) Reerricy Inc, 3401 or 'Npar 3341 <br />the pre- instal lotion pressure test, Pressudze the pHrnory Onner) tarsk to o ryfln�rnum of 4 psi (rno�kimurn 5 psi), <br />PhiMps Flers Corp - "Supac 4NF" Fdbdc <br />,ure vicreose C , a t, j ti o n,. [7-WHe,)st level in tonk must never exceed''woter bockflil) I 101vel, t6n� ho'�e SIR <br />Monitor the presscire gouges for I hour, There shouk) be no press Hoerhst Celonese Corp, ­ Treviro 31120 <br />3. CHOCENG: Chock Wnk�s in accordance Mth mcinufocturer's recornmendotion uri0 re�:17J, for in the secondary (outer) lank. Spap tank Wings, rlur�nq instafl(,AJon, or fabric approved by the, took rnanufocturer, <br />InstoHation, lf wbdy condRions elst or are expected, anchor Tanks uF4ing rninimurn 1 2" nyk­n <br />or hernp rope over, each tank ond secure to stakes of aclequate size to prevent rnovement of the ElSecondary T'ank TcisU,,A,eove the pmssure on the primary tank, Vsir�g 5, instaH Se cable guad% g0des, etc, on the, de,�,s'iqhoted ribs of to'nk, <br />o flexiWe alf� hoso rnanifokJ, connect tho 6r, pr(,��ssure hose frorn the prirnary tank (Notc "Designated ME! dre awrked by d"As oh' tho tank <br />to the seq)ndop'tank. Jhio hartfold h9se Amid bee connected to the <br />to rennWn -,,nt/rnon�tr,-�r, (Ming that doos not AnAM the plessu're c auge, t e a <br />4, qP(NWGS: AH twws '00 shipped orb h", "drist coydr$�' poch opeNy" Dust covers are We the voNe Cqykn; Up not p I oe: o or cqbkof Wow. tho dbs of h t h0 <br />in each ope&114010 "AcW Q tho pre- i�,cto'H6tio s�,ure test,' A0 t,,�inks rnust" have either to the prir ion the and Isconnect A suopiy_' PressutTze the secor dar tank ? <br />P <br />a durst cop in p�ace or a 5 psi pressure re�ief vafv�,�� in, ot aH nn e,,,,, by QeQg the bel,wee,h, the pnm,,,�i!-y orid sl�<ed'hdo�y torik, Soop t6o e� tire 1005i WOW 6f 109 r; -at M (�Icws ifu <br />tank and aH faUng? z oppohe, loops on lb 71�ulrf hjfq� wowl Q ova 6 <br />J 6 thi" di*rdhr), <br />5� DAVAOE� �nvxpect <11 tanks <br />grel%H, fw syna of damage upon reApt, Note ny domm ge n the <br />shipping doctirnents and ru) fy the Cornpan� Rep, C."orJoct the tar�k rri�,,inufacturer for Upon cor QUon of the teA rdeosi pmsswe frorn the secondary tank prWr to or'le en�,J of et,:)ch cctOe� ls, be crowed cmer tha top of the Wink fn'� the,` 066"', <br />nfe r" J -Q rU,i Q n p f the <br />criditional informotion. rbeaskq pressure from the pArnal tonk, holt-down soop, Using thme cobkw ck rps on eoxh set of lobtes, QN(IN both cabky <br />together or) top of the twk, Prior to bghten�hq th� ck,,rrys,, tension this 000 01h ckmeh­" <br />if the tonk is daniaged at �,-,,iny other tirne, do not attennpt repcirs, Notify Cornp(,,)ny R(�,,�p. who 11 P0ST-NSTMJAfl0N PRESSVRE TE5TJ AM� E:,�trery��e care 5 to be used around a -longe sqqun� RoUQ1 terlsi�n to 'not <br />outsido tl"�e fo,,,,nk hole, Usb e khf Wj t <br />wili determine the course of action, an,,J nec,)r any pressurized tank, to dif the"'4'(Ngs or cn,,�sh U -,ie tank, <br />6, Hi­rING: Set Wnks on pmpwed bed Ah a sWpe downward toward the fill end of the tank, kP%wry Qnor) Tank Test: Perform this test with 0 tank risers and Mthigs Cout5n; AM sets cq cables on o tank rnust be tighter�ed e UONY' to avoid Wit def&rnollon, <br />A slope of 3" difference between the two extenre opeongs of the tonk is desired. The attaded, Tightan aH hank fHngs, Locate a msswe gmige in one of To wwular <br />acceptoble range of slope 4 *' rnoxininrn and 2" mommurnq wRh the fill s,,nd lower than remote space monItr,,'� fittInqs in the secandary (outer) Eank, Locate' a second prmv,lre "The cable rmist rest on the top) of the hold-down skap b1t6en the guldes prq&& <br />purnp end of the tank Tanks that eneed Me ance0able slope or thot ,�Oope downward to the gcuge wRh a 5 pi-presRwe relief, to one of the primory (inrier) tonk fitt)n�js arid Repeat this proc0ss for eat$ set of Ue-down caWes, <br />rernote purnp end ore irnpropeHy set ond rn�,,ist be reset connect the pressl,,ire hose t<> this some QjUng, Fkenudze qm pArna, JAwer <br />taA to o rninvnurn of 4 psi Qlaxiamurn 5 ps�), So(,,7p all tortk fittings and I nionitor ARer all Ue-downs are completed, �,ommenca the br:0611 pro�.�dures to 014, toc <br />p of the <br />7, INSTALtATlON WRH APPROVED MATEMALER %ce a 12" HA of backN41 everly ; round jhr: presspre gauges for a nnin�rnurn of I hour 1here sh�ould be no pre'-sSure tanks, <br />tile WM rusn DOCKHO cornpletely L derneW me tonk beteve,,,,nn tho us and undw too end <br />cops. This is the most important pad of the backfill pwocesq 111rocedure can be done from <br />bank or adjacent tonk top, If a mcm W be in the hole to world' We backhT hole must be Elgecondcq (Outeo Tank Test: Chsconnect the ad supp! but mcintain the pressure <br />shored C)r Me loped as prescObed by cu"ent OSHA reguhUons, on the pr�rnary lank, Pressur;ze the secoridary (outer5 tank UShg (3 N&ble dr hose <br />rn,cr0oW, Connect a pressure ho*e frorn the prin-iory tonk to ti,��e anr,,ular sl5oce, <br />PKe second 11' Hft or backid evenly around the tanks, Again, repeat Une `,workin4' of mordtar fAtbig that does not contain the air pressure gouge , Pres,�,�,,�rlze tho <br />backVH between the r�bs and under the end caps, Add bocVNt even�y around the tanks up secondary tank by openbg the ma=d volve between the printury and secondory <br />to the tops of the tonks, tank. <br />BockfOl io subgrade after pi&q and testing is cornp�eted, If necess,�ary, brin(,�l �,.-wessure of both tanks to a minirnt.jrn of 4 pi Qumimurn 5 psl) <br />'tirig tFie o;r supp�y to th�e pf-Irnory tank, <br />by reconne�, <br />aterials must be compacted <br />8, INSTALGNTION WIFH ALTERNATE 10TEFOALY AH alternote mv <br />to 903 reWtive densityJASTM D -15r)7-,70), Contractor 'is to furn�sh Company Rep, with Mon% the pressure for 1 hour and soop oH tonk fitfing% Mere ond pipe <br />cerMication of compor: on from o reqi3tered soil eq�neer, connecCons. Upon cornp�etion of the test, release the air pressure frorn the <br />secondary tank prior to re*051Mj preisure from Uw pdmn ry Wnk,, Damage to the <br />Company Rep, is reWonfWe for providing the exact installotion spe6flcaUon for alternate priti,,ory t,�,,irik rnay re��,�Wt if the l5ressure �s nct relieved froin Ge secondaq tank <br />first, <br />Wdion! Rekeve all tonic pressure prior to rernoving any Qtings, Qlys' <br />No tank hot shmYs any evidence of a Kok is to ba ept in the system, Any <br />darnage incurred tc.) the tank,duHng the instaHoflon �'Yill be the GnVactoes <br />respons�bihty, The Cornpany Rep, is to be noNed of any darrv,,,ige �,,)nd wil� <br />doternAe WO courso of odon to t,,�o ollowvd. <br />If o hydrr,,,stotic test is reqdred by the knal agency, isolate the tonk for, testing ond <br />recminect when testhig is complete, The Qydrostotic test be obta�ned by 1� <br />Chewon, <br />Von,"," <br />TERNAL NAEASUREMENTS: Take hternal di&neter meaeureumnj at W hH and <br />11, IN the rebte <br />p openings FRP tank, The Contractor, witnessed by Q <br />r�u n' on boh AngW and d)uWe wal <br />-nporry Rep, a respon�ciWe for n Wng oru recording these Measurements on (3 form Provided <br />by the Cornpriny, Take Me Tst set of measkernents yHor to placing any backCH around the 7 <br />tnnk� The second set., of rneosurenn�ents i,e taken when the backfH� has reoched subgrade (prior -77,7` 7, <br />to pour�nq the concrete slab), <br />v <br />. ......... . ..... <br />1 7� -7 r= 777--'-----, "77,,7,77 <br />7 <br />17 <br />2 3 44 5 10 11 12 14 as' 10 J, <br />rJUMMM, ==WW=15=rr=%"=T1M========== <br />MMORANZIMMMM <br />04 DOUBLE WAL.L. FRI"I INS"FALLATION TANK rE'5flNG <br />05 TANK HOLT-DOWN 1NST/A[,_1,.AT10N 0 6 P/TTC H PAVING AND CONCRETE WQF140 <br />9 PRE-INSTALLAnON ITST SET UFO Prior to the pre -Installation test, all sh�pp�nq pods roust GENERAL REQUMEMENTS: Anchor c1l undergrcu�nd stor trjr)ks with concrete hold-downs <br />hANTEFFIAL& Double, -Wall fiberglass Wnforced plostic (FRP) storoge tonks (,,)F, supplied by Chevron be removed Boni Te tank and the vocuum on the annular sp,,xe must be ("lcgi' or deadmen") when specified by Cor�,pony Rejl�,?,`Ithe Scope of Work, Refer to dr , owing SCOPE OF' WORK� <br />me to be KstaHed by Contractor in accordance with the p�ans ond 15pecificaflon�,,,, �W F- 10 (N - 11 F -T- - F 10 - 5), <br />A vacuuni on the unnuWr space h not a subs0tute for the pre- i nstal lotion test, AH irstoHotion Potch Pavinq� Patch poving work applios to minor work in connection with covering of p1pe <br />tests niust be performed and recorded on company suppfled forms, 'Tonk bedding, t�aHostirng and tank hole backfM procedures are descfted under Section 02 of these trennhes, areas Qacent 5 tonk tab and other areos disturbed during' tank installoti6n. <br />Double Wall Double YAH specHations, <br />10 TANK TESTING - lNSTM,JCTIONS� <br />Concrete: Concrete rvork appHes to istalling tank slo <br />repak of We slobs and othd areas <br />The tank onchoncige systern shown on the circiwings is designed for a moximunn level cq ground w9ter distributed duhng tonk �nstnHotion, Rofer to opplicob!e droMrIg' F-4 or F--7 <br />15000 21 - 5 - 3/1' L 'ong General: Notify Cornpnny Representat�ve, who MUST observe all tests, at least 24 hours equo� to the suborade �eveL for slab deta& <br />10' - 4" 6 �15, in advance of nny test, <br />12000 3T - 0 -1 IV' Lono 3 (Y 3" Long MATERIALS: <br />8' (f O�D� 1 O'D, rhp pressum uppkation systern is to have two pressure gauges;(range 0 to 10 psi with 5 <br />10000 3 1' 6-,1/2" Long 303 q Qng pw pasnae Kok) in thi systenn, both in good candi6c)6 orid oving been tested ond 1. CONCRE�'E HOLD-DOWN& Pre-cas[ ro�nfe,,,�rced concrete 0age 12" a 12" or 1,21 x 18"'j'A <br />81 1. /2" (11D� <br />81 (f (TET cWhrAed within a three-manth period rkior to the tank test (copy of Se test ond cross-seckn, with charnfued edges Length, slr;c,�',n ;A Ohs hwerAgs, 1121 "dinneter <br />1 1000 IV 4- 1 /1' Long 1 6-1/8" Long cW10% d5a to be furnk3hed to the Company Representotive upon requ,�­4,t), ga�vanized stee� c4nchor �oops are to be r: ", ast into "logs " at Nations hown,'' 11 P , r C s t rn ri a I <br />4' 0, D, 4" J- 1 47 0, D, shaH have achieved Rs Wtimate compoessive skength of 2500 psi (2,8 daye)�,�r'�6r <br />USE EXTREME CARE AROUND A14D NEAR THE Pl`?,,E5SURlZED TANK, Reheve <br />(Notc CID. J over the %) 07 APPROVED MATERIALS <br />the pressure prior to rnroving the tank or rerroWng any of Te AtUngs, Pre -cost concrete fourWadon ples which meet cw exceed above specificofloKs, dre, actept,6b�e,, <br />DO NOT inskoH a tank witch shows any evidence; of feak�ng rhe Company Representative 2, WIRE ROPE CAMS: Hat­d�p g�,,flvanlized steel vire ropo, ryiln4n�)ni 11/2" diarAtekhre6kino <br />rhe contractor will furnish the exact hordware �isked on the Bill of M�,,,Aeriois unless otherwise 1 to be noNed and wil deeurhe the cowse of oction that wdl be followed, strength, 20,4K, APPROVED BACKFILL vArEWALS� <br />q <br />specified by the Cornpany Rep, The Contmctor is lespcoisible for 0 labor', rnateriai ond (4, 'uipment neces�sory to Conduct <br />the following %Q 3, �IARDWARE; Cable clamps, coWe guides, guords, eta shoH be hot -dip gcflvonized' stetfl� 1� P F)N G, MMI L A clearh naturalygounded aggegWe with a 1/8" minirnum and a 3/*' <br />Other Contractor suppHed eqWprnent inch,.�des: vapor recovery (when specMed) Phase I Assernbliew <br />Arlopters, dLASt caps and normeplate �,m�ders, Phase I Eqdprnenh Ant! - hiec� irc kilo tion volve, high hose Pre­�w,,,,,,tolicition Pressure Test, Air moximurn d�arneter, Up to 31% f the parUc es may pass through a #8 steve, <br />retractor, nozzle swNels, flow Hmiter, anti -kink springs, swiQ stops, clarnps, extension, Post-lnstaHaHon Pressure rsst, Air or Hydrostatic 4, PROTECTVvE COA,pNG� P6or to backfHrv,') tonks, oppiy a qenerous quantit, o Ch, rph <br />K ',A f O� 2b STONE OR GRAVO_ CI�USHIN(�S, 'Noched mdedO, Mth pqrtic�e s�ze bebveen 1/8" and <br />Ampholt Coating" by bush to aH exposed steel cables, �oops dnW hardware. 1/2 "� Up to 3% of the porkles may pois through o 8 5ieve, <br />(Ot the submeMed chop tube for product and heaUng fuel tonks of a 45' on��,k, so the lowest point L ACCEPTABLE SOAPS, WoopkAf the tank mHor and NtAings uYng a srnoll garden- # <br />YA1 be T (Hoki true) frorn tho bottorn of the tank The highest pAnt amst im a type hand -pressurized spro"Y muli, rhe test,soop shad be a hitih foam�ng "soap" that �NSTIALLATION PROCEDURE� Approved matedWs crust be dry, free of A and snow, ond meet A TNA (C-33, Pora, 7,11 fo,r quafity�_ <br />maximum of 6" frorn the bottcon of the tank The 6" rnoxin�urn d�mencion �s critkri� du�e to air 0bbles easHy if in contact" vAh an A Wak 0 the tank but won t bW,,:�ble d�,,�e to and soOndness, The dry gravel dens�ty must be o rninimurn of 911, pounds per cubic foot <br />quality ruies.-"Ment Te subawrged dmp tut)e to direct incom�ng pnodu�c,,t toword the opposite end dispensinq frorn the pressure opplicator, Acceplabde soops ore! 1� F1reP(,,)re the tank hole to recebe hof? -down AgA Install thodng (or side Appy) K <br />of the tank. Refer to instalAtki drawings for ad01ona� detc0s, accordance w1h SecCon 02, 'TANK HOLE iJNER: Conlador is to provide a Mer Fabric Tonk Hoki Uner whm, <br />"Seorn "Fest Concentrat%,� <br />1 , HANDLING: The Controctor is re3pona ble for off-ka&ng the tonks from the de6very vehkle, MWO Loc High Soop 2, Purnp the woter out of the t�,,7,nk ho!e, Keep wNer out of the took hole LTMH" tnn�s hove a) Tank ho�e is in unstoWe soil, or <br />A crone or backhoe of mANcient WUng rapa0y must E,�e usk",�,d, The weight of the douWe woH 5outhbend Leck Detector" been sK 6ed down, ballosted eond backfilled, <br />FRP tank is approxirnate�y 5000 - 6000 lbs, dr opproved equo� <br />h b) SpecMed by Company Rep, The Mq Wnk holo (sides and bottorn) shall be covered, 1,.,Cjy <br />1 insert each cobka through its own anchor �oop wi t e loi� xsenring, suMent cable to that the fribric wRh 2 foot minimufn ove0aps, <br />2. LIFING ck 14OMNQ When lifth g or nioving an FRIP tonk, a�rvayF, t�s�D properly s�zed iL PRE,­INSTA� �,APQN PRESSURE TEST, AN: Use extrerne� cgre around and near both (irids of the cabi wM be kept at Me top of the to k hole '6f ter, tho, " lQ( r <br />a 0 s <br />equipment and Sit by Wrmt Qs(s). On lorge b,'inks, greater than 8' dwrneter, use a spreader any ywessuNed tank. Never prMUNZe seconday (outer) tank vithout pre,,,�Surifng Lowa and poslon the "Fog? 0 the tank hoW keeping hath ends of the qobWi at the tf:')p Beddng indericA, tie -d I ond sample wels are to be placed on the top of Me fiRer <br />bar to enswe a fft 'ang�e 'bf (it Wost 45 deqree-� at, e " -,Ich fiftig lug, the pdrnary (inner) tonk, of the hoie. InstaN the It' adniniurn thick beddng maNdal in tonk Sruooth drid own OgS <br />< slope per Te tank bedd�n,,j instructions, f6brIic, Excess faNk at the top of Ow hWe should be h0ded over the backnH nnoterial of <br />subgrode �eyef, <br />Never roll or use cobfes or chaRm around an FRP tcink, Set on smooth ground, free of rocks A.Primory (�nner) rank Te�at: Locote o prescure gouge in the vent/monitor fitting j <br />and f�,reiqn objecAs. �n the soconda, (Mdw) tank, Locote a second pr�,,,ssuro gouge at the FiH 6pening C Pioceed with setting th; tanks by adding boHast os neceslay to Ank'Andleop ddwn the, APPROOED F�LJER FAFMC MATEMAL� A <br />and connect the air pressury to this IRSIg, tcnkt,,��, Use 01 enough b0ost to hoW the tanks down unbl the MAN A 606 with the <br />Exaptiom FRP Tonf may be r5led up to 90 degrees on a srnooth clean surfa<:e when performing top of the tanks� (Refer to SecUon 04 for tank setting requiren%k) Reerricy Inc, 3401 or 'Npar 3341 <br />the pre- instal lotion pressure test, Pressudze the pHrnory Onner) tarsk to o ryfln�rnum of 4 psi (rno�kimurn 5 psi), <br />PhiMps Flers Corp - "Supac 4NF" Fdbdc <br />,ure vicreose C , a t, j ti o n,. [7-WHe,)st level in tonk must never exceed''woter bockflil) I 101vel, t6n� ho'�e SIR <br />Monitor the presscire gouges for I hour, There shouk) be no press Hoerhst Celonese Corp, ­ Treviro 31120 <br />3. CHOCENG: Chock Wnk�s in accordance Mth mcinufocturer's recornmendotion uri0 re�:17J, for in the secondary (outer) lank. Spap tank Wings, rlur�nq instafl(,AJon, or fabric approved by the, took rnanufocturer, <br />InstoHation, lf wbdy condRions elst or are expected, anchor Tanks uF4ing rninimurn 1 2" nyk­n <br />or hernp rope over, each tank ond secure to stakes of aclequate size to prevent rnovement of the ElSecondary T'ank TcisU,,A,eove the pmssure on the primary tank, Vsir�g 5, instaH Se cable guad% g0des, etc, on the, de,�,s'iqhoted ribs of to'nk, <br />o flexiWe alf� hoso rnanifokJ, connect tho 6r, pr(,��ssure hose frorn the prirnary tank (Notc "Designated ME! dre awrked by d"As oh' tho tank <br />to the seq)ndop'tank. Jhio hartfold h9se Amid bee connected to the <br />to rennWn -,,nt/rnon�tr,-�r, (Ming that doos not AnAM the plessu're c auge, t e a <br />4, qP(NWGS: AH twws '00 shipped orb h", "drist coydr$�' poch opeNy" Dust covers are We the voNe Cqykn; Up not p I oe: o or cqbkof Wow. tho dbs of h t h0 <br />in each ope&114010 "AcW Q tho pre- i�,cto'H6tio s�,ure test,' A0 t,,�inks rnust" have either to the prir ion the and Isconnect A suopiy_' PressutTze the secor dar tank ? <br />P <br />a durst cop in p�ace or a 5 psi pressure re�ief vafv�,�� in, ot aH nn e,,,,, by QeQg the bel,wee,h, the pnm,,,�i!-y orid sl�<ed'hdo�y torik, Soop t6o e� tire 1005i WOW 6f 109 r; -at M (�Icws ifu <br />tank and aH faUng? z oppohe, loops on lb 71�ulrf hjfq� wowl Q ova 6 <br />J 6 thi" di*rdhr), <br />5� DAVAOE� �nvxpect <11 tanks <br />grel%H, fw syna of damage upon reApt, Note ny domm ge n the <br />shipping doctirnents and ru) fy the Cornpan� Rep, C."orJoct the tar�k rri�,,inufacturer for Upon cor QUon of the teA rdeosi pmsswe frorn the secondary tank prWr to or'le en�,J of et,:)ch cctOe� ls, be crowed cmer tha top of the Wink fn'� the,` 066"', <br />nfe r" J -Q rU,i Q n p f the <br />criditional informotion. rbeaskq pressure from the pArnal tonk, holt-down soop, Using thme cobkw ck rps on eoxh set of lobtes, QN(IN both cabky <br />together or) top of the twk, Prior to bghten�hq th� ck,,rrys,, tension this 000 01h ckmeh­" <br />if the tonk is daniaged at �,-,,iny other tirne, do not attennpt repcirs, Notify Cornp(,,)ny R(�,,�p. who 11 P0ST-NSTMJAfl0N PRESSVRE TE5TJ AM� E:,�trery��e care 5 to be used around a -longe sqqun� RoUQ1 terlsi�n to 'not <br />outsido tl"�e fo,,,,nk hole, Usb e khf Wj t <br />wili determine the course of action, an,,J nec,)r any pressurized tank, to dif the"'4'(Ngs or cn,,�sh U -,ie tank, <br />6, Hi­rING: Set Wnks on pmpwed bed Ah a sWpe downward toward the fill end of the tank, kP%wry Qnor) Tank Test: Perform this test with 0 tank risers and Mthigs Cout5n; AM sets cq cables on o tank rnust be tighter�ed e UONY' to avoid Wit def&rnollon, <br />A slope of 3" difference between the two extenre opeongs of the tonk is desired. The attaded, Tightan aH hank fHngs, Locate a msswe gmige in one of To wwular <br />acceptoble range of slope 4 *' rnoxininrn and 2" mommurnq wRh the fill s,,nd lower than remote space monItr,,'� fittInqs in the secandary (outer) Eank, Locate' a second prmv,lre "The cable rmist rest on the top) of the hold-down skap b1t6en the guldes prq&& <br />purnp end of the tank Tanks that eneed Me ance0able slope or thot ,�Oope downward to the gcuge wRh a 5 pi-presRwe relief, to one of the primory (inrier) tonk fitt)n�js arid Repeat this proc0ss for eat$ set of Ue-down caWes, <br />rernote purnp end ore irnpropeHy set ond rn�,,ist be reset connect the pressl,,ire hose t<> this some QjUng, Fkenudze qm pArna, JAwer <br />taA to o rninvnurn of 4 psi Qlaxiamurn 5 ps�), So(,,7p all tortk fittings and I nionitor ARer all Ue-downs are completed, �,ommenca the br:0611 pro�.�dures to 014, toc <br />p of the <br />7, INSTALtATlON WRH APPROVED MATEMALER %ce a 12" HA of backN41 everly ; round jhr: presspre gauges for a nnin�rnurn of I hour 1here sh�ould be no pre'-sSure tanks, <br />tile WM rusn DOCKHO cornpletely L derneW me tonk beteve,,,,nn tho us and undw too end <br />cops. This is the most important pad of the backfill pwocesq 111rocedure can be done from <br />bank or adjacent tonk top, If a mcm W be in the hole to world' We backhT hole must be Elgecondcq (Outeo Tank Test: Chsconnect the ad supp! but mcintain the pressure <br />shored C)r Me loped as prescObed by cu"ent OSHA reguhUons, on the pr�rnary lank, Pressur;ze the secoridary (outer5 tank UShg (3 N&ble dr hose <br />rn,cr0oW, Connect a pressure ho*e frorn the prin-iory tonk to ti,��e anr,,ular sl5oce, <br />PKe second 11' Hft or backid evenly around the tanks, Again, repeat Une `,workin4' of mordtar fAtbig that does not contain the air pressure gouge , Pres,�,�,,�rlze tho <br />backVH between the r�bs and under the end caps, Add bocVNt even�y around the tanks up secondary tank by openbg the ma=d volve between the printury and secondory <br />to the tops of the tonks, tank. <br />BockfOl io subgrade after pi&q and testing is cornp�eted, If necess,�ary, brin(,�l �,.-wessure of both tanks to a minirnt.jrn of 4 pi Qumimurn 5 psl) <br />'tirig tFie o;r supp�y to th�e pf-Irnory tank, <br />by reconne�, <br />aterials must be compacted <br />8, INSTALGNTION WIFH ALTERNATE 10TEFOALY AH alternote mv <br />to 903 reWtive densityJASTM D -15r)7-,70), Contractor 'is to furn�sh Company Rep, with Mon% the pressure for 1 hour and soop oH tonk fitfing% Mere ond pipe <br />cerMication of compor: on from o reqi3tered soil eq�neer, connecCons. Upon cornp�etion of the test, release the air pressure frorn the <br />secondary tank prior to re*051Mj preisure from Uw pdmn ry Wnk,, Damage to the <br />Company Rep, is reWonfWe for providing the exact installotion spe6flcaUon for alternate priti,,ory t,�,,irik rnay re��,�Wt if the l5ressure �s nct relieved froin Ge secondaq tank <br />first, <br />Wdion! Rekeve all tonic pressure prior to rernoving any Qtings, Qlys' <br />No tank hot shmYs any evidence of a Kok is to ba ept in the system, Any <br />darnage incurred tc.) the tank,duHng the instaHoflon �'Yill be the GnVactoes <br />respons�bihty, The Cornpany Rep, is to be noNed of any darrv,,,ige �,,)nd wil� <br />doternAe WO courso of odon to t,,�o ollowvd. <br />If o hydrr,,,stotic test is reqdred by the knal agency, isolate the tonk for, testing ond <br />recminect when testhig is complete, The Qydrostotic test be obta�ned by 1� <br />Chewon, <br />Von,"," <br />TERNAL NAEASUREMENTS: Take hternal di&neter meaeureumnj at W hH and <br />11, IN the rebte <br />p openings FRP tank, The Contractor, witnessed by Q <br />r�u n' on boh AngW and d)uWe wal <br />-nporry Rep, a respon�ciWe for n Wng oru recording these Measurements on (3 form Provided <br />by the Cornpriny, Take Me Tst set of measkernents yHor to placing any backCH around the 7 <br />tnnk� The second set., of rneosurenn�ents i,e taken when the backfH� has reoched subgrade (prior -77,7` 7, <br />to pour�nq the concrete slab), <br />