My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1985 - 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
BILLING 1985 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:37:49 PM
Creation date
11/7/2018 4:55:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1985 - 2001
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\3440\PR0231173\BILLING 1985 - 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' . • 'rbOJn ! C <br /> STATE OF CALIFORNIA a ^���^ <br /> STATE WATER RESOURCES CONTROL BOARD + <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B � , j <br /> !� COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM °a��o�e,. <br /> FFFF"' /,,,, <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT6 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT a TEMPORARY TANK CLOSURE ❑ B TANK REMOVED <br /> DBAOR FACILITY NAME WHERE TANK IS INSTALLED: "'��f'� ' ) . �? _� ( (,•% <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) Q -� r (jti;; D. TANK CAPACITY IN GALLONS: V I G oQ <br /> II.TANK CONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1a REGULAR O q GASAHOL <br /> 3 DIESEL ❑ 7 METHANOL <br /> GAS <br /> A <br /> UNLEADED <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT1DUNLEADED ❑ 5 JETFUEL PREMIUM ❑ <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF �1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 9 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING NO I I 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING I� <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES NO_ �I <br /> D.CORROSION F—] 4 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP yl� 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL U )2 DOUBLEWALL AU 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 RARE STEEL A"U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U 6 100% METHANOL COMPATIBLEW/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ i AUTOMATIC LINE LEAK DETECTOR 2 LINE TIGHTNESS TESTING ❑ 7 MONRORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMA A AST USED(MO/DAY/YR) 2. SUBSTANED CEREMAIQUANTITY <br /> OF GALLONS 3 WASNERTMIUEDW$TH YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED&SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OFTHE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMITNUMBER PERMITAP R ED BYI TE PERMIT EXPIT11 DATE / <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORME (12-91) "}��.,�. y r.� FOR00349-R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.