Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE I One form per taeili <br /> Rat. <br /> TYPE OF ACTION ❑ I.NEW PLAN 2i 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> h. <br /> FACILITY ID# (Agency Use Only) — <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> �!nrF <br /> 103. BUSINESS SITE CITY 104' <br /> BUSINESS SITE ADDRESS <br /> 34 p E-, Hi zt^ SI StDcl�{rM <br /> II.'SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system <br /> • Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended ase,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 fords that <br /> it is non-hazardous. Used absorbent material,reumable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clew-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordantee, <br /> with <br /> 22 CCR <br /> §66262.11 finds that it is non-hazardous. if the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated A thick Boating petroleum Y Y <br /> not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if my of the following conditions occur <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other data the product/waste stored in the primary containment system, is placed inside secondary containment to heat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> M. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept pehmznwtly on-site islisted N the facility's Hazardous Materials Business Plan. This <br /> equipment is respected at least monthly,and after each use,supplies are replenished as needed Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: Com fere on1v i a licable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Rio. R20. Itx n Alis 2 A Ria. <br /> 5 t ,resp t <br /> LLm <br /> R1 1t21. <br /> R12. R22. Rai <br /> R13. R2i. R33. <br /> R14. R24. <br /> R13- <br /> R2 <br /> Pis. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: x50. <br /> NAME740. TITLE <br /> Jc�.>^ L�2, u,iAe <br /> NAME <br /> R41. TITLE RSI. <br /> SINS' er <br /> Roz TITLE 1152.NAME <br /> NAME R43. TITLE - R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: R60 <br /> [31. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION n-2. INSPECTION BY QUALIFIED PERSONS [13. RECALIBRATION OF EQUIPMENT <br /> R61. <br /> ❑99. OTHER(Stimify): <br /> UN-022B-V3 www.unidocsorg Rev.04102/08 <br />