Laserfiche WebLink
AOL Alsk <br /> UNIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- I of 2) <br /> a 490.1 <br /> TYPE OF ACTION ❑I.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> v 49o-z <br /> PLAN TYPE ©'f.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACIILCfY. <br /> � (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMN' <br /> L FACILITY INFORMATION <br /> FACILITY D#(Agency Use Only) - <br /> I. <br /> ' BUSINESS NAME(Same as FACILITY NAME)W,.'f.'d; <br /> c BUSINESS SITE ADDRESS -3 't�;. _ �: S. 103. CITY S•{UC K-Lo'%^ CA, S7.0 S loe. <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive mein[enencc,and calibration of monitoring equipment(e.g,sensors,probes,line leak detectors,etc.)must be Perfonoed at the frequency <br /> specked by the equipamm t manufacmrass'instructions,or annually,whichever a nwre frequent,and that such work must be perfumed by qualified Personnel. <br /> 23 CCR 263 2634 2638 2641 <br /> 490.3. <br /> MONITORING EQUIPMENT IS SERVICED 21-ANNUALLY ❑ 99.OTHER(Specify)-' 49 3b <br /> in.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. SITE PLOT PLANUMAP PREVIOUSLY SUBMITTED. (23 CCA§2632, <br /> 263,1,4 9x4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(EVTERSTITTAL)SPACE(S)OR SECONDARY CONTAINMENT 490.3 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) °sob <br /> SECONDARY CONTAINMENT IS: LTYa DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d TINDER VACUUM <br /> 49o-z MODEL#: H C- 490.8 <br /> PANEL MANUFACTURER: <br /> 490.9. <br /> LEAK SENSOR MANUFACITIItER:` D MODEL#(S): 490.10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TAAPKr�.(23 CCR 22643) 490.11 <br /> a9alx MODEL#: 644--- 490.13 <br /> PANEL MANUFACCURER: ' <br /> 49x14. MODEL#(S): f- 1<<� 490.15 <br /> IN-TANK PROBE MANUFACTURER: <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DARLY/MGHTLY ❑ c WEEKLY 490.16 <br /> d MONTHLY [Ie.OTHER(S ify): °4W11. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.02 g.p.h. ❑ c.OTHER(Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.21 <br /> 490.21 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MIG)(23 CCB§2645). TESTING PERIOD: ❑ s 36 HOURS ❑ b.60 HOURS 490.22 <br /> El 5.TANK INTEGTY TESTING(23 CCR§2643.1): 490.D <br /> RI <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BIENNIALLY ❑ C.OTHER(SPemfy): 4W25 <br /> 490.96 <br /> ❑99 OTHER (Specify): 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check allONTIthat apply) <br /> .CNUOUS MONITORING OF PIPET P1PING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49o-zs <br /> VISUAL ALARMS (23 CCR§2636) ,,, 490.29 <br /> SECONDARY CONTAINMENT IS:1Ja.DRY ❑b.LIQUID FILLED 0C.PRESSURIZED ❑d UNDER VACUUM <br /> PANEL MANUFACTURER C: (1 C- 490.30 MODEL#: lti G 49x31 <br /> 490.3z MODEL#(S). rt�Q Z3 Lf+fi CQOG 490.33 <br /> LEAK SENSOR MANUFACTURER: '� 0. C U - <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. LYES ❑b.NO 49x34 <br /> YS. <br /> FAILURE/DISCONNECION OF THE MOMIORWG SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 9-t YES ❑b.NO 49 33 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAKJSCR °90'M <br /> MLLD MANUFACTURER(S): 1 R<t _ h 60,a <br /> _.cl u)-4v ?"" MODEL#(S):,Y I IZ�-G -�I0.C'er-L (FXI✓ <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 gh..pLEAK TEST'S (23 CCR§2636) 490.39 <br /> a9om. MODEL#(S): 490.41 <br /> ELLD MANUFACTURER(S) K <br /> PROGRAMD IN LINE LEAK TEST: 1.MINIMUM MONTHLY 0.2 g.p.h. El2.MINIMUM ANNUAL 0.1 g.p.h. 490.4: <br /> MEMI <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO 49o.a <br /> 4.PIPE INTEGRITY TESTING 49 5 <br /> TEST FRE%W a ANNUALLY '1 b.EVERY 3 YEARS c.OTHERS i 490.44°90-1i <br /> 5.VISUAL PIPE MONITORING. 49a4a <br /> FREQUENCY ❑ a DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY 9 EACH TIME SYSTEM OPERATED' 490.49 <br /> •Allowed for mou a.bond fid ' NSC 391. 3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(1x3)1• 49 50 <br /> El 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 d90.s3 <br /> ❑ 99.OTHER(Specify) 49o-s3 <br /> UPCF UST-D(122007)1/4 <br />