My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2013 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
BILLING 2013 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:16 PM
Creation date
11/7/2018 4:55:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2013 - 2015
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\3440\PR0231173\BILLING 2013 - 2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORN.- <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 0 2.CHANGE OF INFORMATION 490'1 <br /> PLAN TYPE B'( MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(.: <br /> I. FACELITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I1 <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Glm'��i; <br /> BUSINESS SITE ADDRESS 3 <br /> 103' CITY Ktu, 104 <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634,2638,2641) <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER(Specify): 490-3a <br /> 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLANINI"SUBMITTED WITH THIS PLAN. B-2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)a9o4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S); <br /> �a 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 0-1i DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: �Cc_f°e 490-7. MODEL#: _F ri C- 490-8 <br /> LEAK SENSOR MANUFACTURER: C) 490.9. MODEL#(S): 20 49410 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYS-FF"Irccn •IONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12 MODEL#: 490'13 <br /> IN-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): z 49°'15 <br /> LEAK TEST FREQUENCY: ❑ a.CON t INUOUS ❑ b.DAILY/NIGHTLY U c.WEEKLY 490.16 <br /> 2-d.MONTHLY ❑ e.OTHER(Specify): 490"17 <br /> 0-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. b.0.2 h. c.OTHERS i °9049 <br /> g.p.h. ❑ g.p.h- ❑ (Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> x90.22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑ <br /> 99.OTHER (Specify): 490'26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> [Y L CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-5- <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: a DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER 67 Z ft i0 C�;(' 490 30 MODEL#: -M C- 490-31 <br /> LEAK SENSOR MANUFACTURER: f 0. C U 4132 MODEL#(S): OOCOOO 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. [Cy5.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 9<YES ❑b.NO 490-35 <br /> [a-2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAKdS DETECTED 23 CCR 26 490.36 <br /> MLLD MANUFACTURER(S)://' ] (tet -�<vj C DSS ' LIQ.:Z,"Mo 37 MODEL#(S):S j a2C 50.C kr4- <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.b.LEAK TESTS (23 CCR§2636) 490J9 <br /> ELLD MANUFACTURER(S) 490-40' MOI)EL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045\, <br /> .r <br /> TEST FREQUENCY ❑ a.ANNUALLY �y b.EVERY 3 YEARS c.OTHERS i 49046490.47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑a MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490,49 <br /> 'Allowed for m rmtori of tmburied mergmcy generwor fuel piping only HSC§75281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA(23 CCR§2636(x)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490.53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.