Laserfiche WebLink
RTO# 58215 474-2 Unleaded <br /> 27. .. 30. HYDROSTATIC 31. 34. 36.NET VatuME 39. <br /> LOG OF TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS M TEMPERATURE COMPENSATION CHANGING ACCUMULATED <br /> CONTROL RECORD TO 001 GAL, USE FACTOR(al EACH READING CHANGE <br /> 28. 29. Standpipe tevel 32, Product In 33.Pmdud 35. 36. 37. Temperature <br /> Retard detaiH al setting u0 Adjustment <br /> DATE Readiip In IMAM Graduate P¢Ola<ed(-1 CAange cc notation <br /> end length <br /> of line <br /> test(Use full Volume Manua <br /> Ienpih of line If needed.) Nn. &pinning Level to TAer... Higher• (c)•(a) p <br /> Sensor Lower- Eapansion• Expansion p)or At Law Lmel compete <br /> i TIME 01 wOkA BelOre Aker PrOdud Reading (c) Contraction- Coneactlon l-) Change per HOW <br /> ITI M.) Reading Restored Reading Reading Recovered(•) AUV)—037M (NEPA criteria) <br /> rMP� 1 J C- gill THIS IS .. <br /> Sf TEST <br /> FACTOR(A) <br /> C-DOLIA111 AP A Y77SiDL3 5� �/ 8f 1 ( ) <br /> qQ t 4 a <br /> 0 0 <br /> o + 4- <br /> H 5- z11 Alf <br /> 1 <br /> i <br /> sT 1 <br /> y . bio ,76(3 f +o ZS <br /> V A <br /> t <br /> P-T Tank Test Data Chart 2 Statement Itisthe responsibility of the owner and/or operator or this system <br /> Tank and product handling system has been teatad tight to immediately advise state and local aut/aritles of any Implied <br /> Additional Info according to the Precision Teat Criteria as established by hazard and the possibility or any reportable pollution to the environ <br /> N.F.P.A. publication 329. This is not Intended to Indicate ment as a result of the Indicated failure his system.Heath Con <br /> ay" permission of a leak. sultans Incorporated and/or SA MENTO EQUIPMENT <br /> a MAINTENANCE COMPANY,INC. s not sums an respo <br /> OR n <br /> ' <br /> T. Net Volume Change at Co on of c sl n Test_gph sibllity,or liability for any lose of o a anvil IT. <br /> ❑Tank and product handling system hasfalled thetanktightn caa <br /> Signature of Taster tog according to the Precision Teel Criteria as established by <br /> N.F.P.A.publication 329. <br /> Date: "- Tank Om(]er/Oparalor <br /> Date —1 J <br />