My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO 1985 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:11 PM
Creation date
11/7/2018 4:56:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2001
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\3440\PR0231173\COMPLIANCE INFO 1985 - 2001.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sacramento Equipment Maintenance Comn <br /> Pa y, Inc <br /> Date_ /o-t.-sfs� <br /> StoFe Work Order k_ S'43( y CNN, <br /> Address ?`11<io g hp T Product_ <br /> STecl;Tvn cA.n <br /> STP Brand i9. n, <<YYrH <br /> RED JACKET LEAK DETECTOR TEST 3_ <br /> PRODUCT. Regular, Unleaded <br /> Premium Unleaded, Diesel (Circle one) <br /> NOTE: USE SEPARATE FORM FOR EACH TANK. <br /> (1 ) Running pressure_2 5 (`) <br /> Shut-off pressure 2j _ <br /> (:%) Amount of product released thru Bibcock tc _ere <br /> (4) With valve open s <br /> tart STF _o-. <br /> . List pressure <br /> (S) F'-educe -- --- - - FSI. <br /> flow to rate of 7 oz. per minute, list pressure <br /> tis flow rate q at <br /> S. I. <br /> (6) Turn STP off, Let pressure drop to zero thru leak just <br /> created. List time for gauge to reach zero -- <br /> min. sec <br /> (7) Turn the STP back: on. Keep lea{; rate - at <br /> pressure '=_PSI. Flow rate at zozzle Bibcock. List <br /> (8) Stop leak with STP still on. Does leak detector reset? <br /> ✓yes no. If <br /> Yes, how long to reset? _-min � <br /> (9) Turn STP off, List sec. <br /> pressure 2 f <br /> F'S I. <br /> 10) Turn STP back on. List time to reach <br /> in. / <br /> _-sec. Pressure rise. <br /> 11 ) List pressure 25 <br /> F'SI, <br /> 12) Open zozzle and list pressure 2 3 <br /> PSI. <br /> SATISFACTORY LEAK DETECTOR <br /> ' <br /> LEAK DETECTOR <br /> Model <br /> Date Code & Serial S(5- o II <br /> 3 Connie Drive <br /> (916) 925-2716 Sacramento,California 95815 <br /> CALIFORNIA CONTRACTOR'S LICENSE*502377 <br />
The URL can be used to link to this page
Your browser does not support the video tag.