Laserfiche WebLink
Sacramento Equipment Maintenance Comn <br /> Pa y, Inc <br /> Date_ /o-t.-sfs� <br /> StoFe Work Order k_ S'43( y CNN, <br /> Address ?`11<io g hp T Product_ <br /> STecl;Tvn cA.n <br /> STP Brand i9. n, <<YYrH <br /> RED JACKET LEAK DETECTOR TEST 3_ <br /> PRODUCT. Regular, Unleaded <br /> Premium Unleaded, Diesel (Circle one) <br /> NOTE: USE SEPARATE FORM FOR EACH TANK. <br /> (1 ) Running pressure_2 5 (`) <br /> Shut-off pressure 2j _ <br /> (:%) Amount of product released thru Bibcock tc _ere <br /> (4) With valve open s <br /> tart STF _o-. <br /> . List pressure <br /> (S) F'-educe -- --- - - FSI. <br /> flow to rate of 7 oz. per minute, list pressure <br /> tis flow rate q at <br /> S. I. <br /> (6) Turn STP off, Let pressure drop to zero thru leak just <br /> created. List time for gauge to reach zero -- <br /> min. sec <br /> (7) Turn the STP back: on. Keep lea{; rate - at <br /> pressure '=_PSI. Flow rate at zozzle Bibcock. List <br /> (8) Stop leak with STP still on. Does leak detector reset? <br /> ✓yes no. If <br /> Yes, how long to reset? _-min � <br /> (9) Turn STP off, List sec. <br /> pressure 2 f <br /> F'S I. <br /> 10) Turn STP back on. List time to reach <br /> in. / <br /> _-sec. Pressure rise. <br /> 11 ) List pressure 25 <br /> F'SI, <br /> 12) Open zozzle and list pressure 2 3 <br /> PSI. <br /> SATISFACTORY LEAK DETECTOR <br /> ' <br /> LEAK DETECTOR <br /> Model <br /> Date Code & Serial S(5- o II <br /> 3 Connie Drive <br /> (916) 925-2716 Sacramento,California 95815 <br /> CALIFORNIA CONTRACTOR'S LICENSE*502377 <br />