My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO 1985 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:11 PM
Creation date
11/7/2018 4:56:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2001
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\3440\PR0231173\COMPLIANCE INFO 1985 - 2001.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 ` <br /> BEAC€SN <br /> RELEASE (Leak) EVALUATION PROCESS <br /> CHECK LIST <br /> Station# Tank# Tank Size Product Date <br /> Check off each step as it is completed. If completion of any of the steps reveals the reason for <br /> exceeding the allowable variation it is not necessary to complete the remainder of the steps. <br /> TO BE PERFORMED BY STATION MANAGER <br /> Date/time: <br /> Step 1 Records reviewed/regauge tank <br /> Performed by: <br /> Date/ me: <br /> Step 2 New reconciliation performed <br /> Performed by: <br /> Datettime: <br /> Step 3 Station physically inspected for evidence of leaks. <br /> Performed by: <br /> ❑ Check all skirts and dispensers for leaks. <br /> ❑ Check all unions,fitting, 4 filter. Also check for strong gasoline <br /> odor 1-2 minutes after opening skirts. <br /> ❑ Check all hoses and nozzles for leaks. <br /> ❑ Check all totalizers, meters, impact valves for tampering. <br /> Step 4 Notify Zone Manager if there is any evidence of leak or if the Date/time: <br /> above steps have not revealed the reason for exceeding the Performed by: <br /> allowable variation. <br /> TO BE PERFORMED BY ZONE MANAGER <br /> Date/time: <br /> Step 5 Records reviewed and audit performed. <br /> Performed by: <br /> Date/time: <br /> Step 6 Calibration on dispenser meters checked. Performed by: <br /> TO BE PERFORMED BY HANFORD OFFICE <br /> Date/time: <br /> Step 7 Hydrostatic Pressure Test performed. Performed by: <br /> Date/time: <br /> Step 8 Precision Tank Test performed. Performed by: <br /> Describe briefly the reason the allowable variation was exceeded. <br /> I hereby certify this to be a true and accurate report. <br /> Signature Date <br /> 3 134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.