My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:08:52 PM
Creation date
11/7/2018 5:07:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\BILLING 1985-1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MED PROGRAM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK J L S ZO12 <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION El1.NEW PLAN rX 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE L MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. PERMIT(SERVICES 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1- <br /> BUSINESS NAME Same as Facility Name or DBA) 3. <br /> BUSINESS SITE ADDRESS 101 CITY 104 <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANC <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performcd at the frequency specified <br /> by the equipment rnanufactuttis'instructions or annually,Whichever i5 more frequent Such Work must be performed by qualified personnel.[D CCR§2632,2634,2635,26411_ <br /> 49 U, <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 4y 3b, <br /> III. MONITORING LOCATIONS <br /> ❑ L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN Dk2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED (D CCR§2632,2634] 490x. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) itiaheak(o <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SEC NDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.(D CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESS IZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: \§tz QA Rogm 490-J' ODEL#: T LC lsnz °90-e. <br /> LEAK SENSOR MANUFACTURER: °9°-9. MODEL#(S): 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TAN S .[D CCR§2643] 490-11. <br /> PANEL MANUFACTURER: 4 1z. MODEL#: 49°.13. <br /> IN-TANK PROBE MANUFACTURER: 9°-14 MODEL#(S): ago-ts. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ .DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY e.OTHER(Specify): 490-17_ <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 . .h. ❑ c.OTHER(Specify): 490909-1s. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[D CCR§2646.1] 49n-20. <br /> E] 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2M5] STINGPERIOD: ❑ a.36 HOURS ❑ b.60 HOURS °90-z1. <br /> ago-90 <br /> ❑ 5.TANK INTEGRITY TESTING PER[D CCR§26x3,11 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIE LY ❑ c.OTHER(Specify): 490 25. <br /> 99.OTHER(Specify): a90-2T . <br /> al <br /> V. PIPE MONITO G IS PERFO ED USING THE FOLLOWING METHOD(S) <br /> 1c <br /> atht eak ly) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AN OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 CCR SECONDARY CONTAINMENT IS: g� a DRY b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> §2636] +� <br /> PANEL MANUFACTURER: 490-3°. MODEL#: T L.S �S 1 O 49o-3r <br /> LEAK SENSOR MANUFACTURER: 490-32. MODEL#(S): L.{QQ 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMAT PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a.}- SE o 490-34. <br /> FAILURE/DISCONNECTION OF THE MON/ RING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 690"35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(ME )THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 49036. <br /> PRODUCT FLOW WHEN A LE IS DETEC D.[23 CCR§26361 <br /> MELD MANUFACTURER(S. 490-37, MODEL#(S): 49x38. <br /> 3.ELECTRONIC LINE LEAK DETECTOR LLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 q 490-39. <br /> ELLD MANUFACTURER(S): - Q 490.00' MODEL#(S): V mI-1 Lh ww O 490-41. <br /> PROGRAMMED IN LINE LE E ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490'02 <br /> ELLD DETECTION OF A PI G LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49()43. <br /> ELLD FAILURE/DISCO CTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. Ca a.YES ❑ b.NO 49()44. <br /> ❑ 4.PIPE INTEGRITY TESTIN . °9°45' <br /> 49046. <br /> TEST FREQUENCY- ❑ a.ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-°3. <br /> ❑ 5.VISUAL PIPE MONIT NG. �y 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY IX e.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049. <br /> 'AllowedfxmolFnon� 9fuuburiede_metgnc Santa fuel grynyew HSC 25251.5 J <br /> ❑ 6.SUCTION PIPINMEETS EXEMPTION CRITERIA.[D CCR§M36(#3)] 490-50. <br /> ❑ 7.NO REGULA D PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.715 CONNECTED TO THE TANK STM. 49x51. <br /> El99.OTHER(S ify) -- + 490-sz. <br /> 49090- <br /> yL <br /> UPCF UST-D(12/2007).1/4 www.uoidocs.org VQ V� <br />
The URL can be used to link to this page
Your browser does not support the video tag.