Laserfiche WebLink
RJUNIFIED PROGRAM CONSOLIDATED FORM <br /> or UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54 <br /> 111.CONTINUOUS ELECTRONIC MONITORING W 2.FLOAT AND CHAP]ASSEMBLY El3.ELECTRONIC STAND-ALONE 49 1, <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): __ <br /> PANEL MANUFACTURER: B�A VO 490-55 MODEL# C —`— —'--___- <br /> _�510�_ 49056. <br /> LEAK SENSOR MANUFACTURER: 490.57 MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES W b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES b.NO 490'60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES !$J b.NO 490'61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. W a.YES ❑b.NO 49062 <br /> 2.UDC CONSTRUCTION is X I.SINGLE-WALLED 112.DOUBLE-WALLED 49063 <br /> IF DOUBLE WALLED: 494: <br /> UDC INTERSTITTAL SPACE IS MONITORED BY:_ 1.LI UID 2.PRESSURE ❑3.VACUUM_ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES b.NO 490-64 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT EN11ANCED 49065. <br /> EAK DETECTION(FEDI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED (23 CCR&26441) <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49o.c6 <br /> 3.SPILL—BUCKETS—)RE TESTED ANNUALLY. --41� <br /> VIII.RECORDKEEPING <br /> The following monitoring/mainumance records are kept for this facility: <br /> �1 Alarm logs 490494 ❑Visual Inspection Records 490381, ❑Tank integrity testing results 49 m <br /> SIR testing results(and supporting documentation records). 490-694 ❑ Tank gauging results(and supporting documentation records). 490-689 <br /> ATG Testing results(and supporting documentation records).49038r ❑ Corrosion Protection 60-day logs 4190-68, <br /> Equipment maintenance and calibration records. 419oUati <br /> M.TRAINING <br /> $f Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490x9. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.691, <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)a9oa9< <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69, <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: `HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49ocsr <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-698 <br /> ❑ OTHER(Specify):m69e,me, <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the httematioml Code Council(ICC). <br /> e"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a marmer consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional cora rm��ents here or indicate how many pages with additional information on specific mothis <br /> nitoring procedures are attached to plan.490-71 <br /> I Y <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME 490-72 TITLE 010. ==q0% <br /> Q 49073 <br /> NAME 49x74 TITLE °9075 <br /> The Designated Opemtbr shall perform a monthly visual inspection of the facility,provide a report to the owner operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certiftillat the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNA 490.76 DATE: 49x77 <br /> G <br /> ' ❑2F e 0. 1 iv f <br /> Do V ' ooa <br /> APPLICANT NAME(print) 490-79 APPLICANT TITLE: 490-79 <br /> UPCF UST-D(12/2007)3/4 <br />