My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:08:52 PM
Creation date
11/7/2018 5:07:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\BILLING 1985-1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA a <br /> STATE WATER RESOURCES CONTROL BOARDUNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM BR COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEMMARK ONLY ❑ 1 NEW PERMIT <br /> ONE ITEM ❑ ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION <br /> 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ❑ e TEMPORARY TANK CLOSURE 154 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: B TANK REMOVED <br /> 0 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- <br /> A. OWNER'S TANK I.D.a SPECIFY IF UNKNOWN <br /> C. DATE IN57ALLE0(MO/DAV/YEAR) B. MANUFACTURED BY: <br /> D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL 4 OIL <br /> B G ❑ 1aPNLE IUM ❑ 3 DIESEL ❑ g AVIATION❑ 2 PETROLEUM ❑ W EMPTY ❑ <br /> ❑ 1 PRODUCT ❑ 1b PREMIUM 4 GASAHOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN 2 WASTE UNLEADED ❑ 5 JET FUEL ❑ 7 METHANOL <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED ❑ 2 LEADED ❑ 99 ETMEq (DESCRIBE IN ITEM D. BELOW) <br /> C A S a <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX D AND E . �f r <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER J <br /> SYSTEM 2 SINGLE WALL ❑ ❑ 95 UNKNOWN <br /> 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL <br /> MATERIAL ❑ 5 CONCRETE113 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br /> (PrimaryTank) ❑ g BRONZE ❑ 8 1009: METHANOL COMPATIBLE WiFRp <br /> ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN <br /> ❑ W OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING <br /> ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING ❑ 5 GLASS LINING 6 UNLINED •,�,� <br /> IS LINING MATERIAL COMPATIBL H 1009: METHANOL? ❑ 95 UNKNOWN Jfi 99 OTHER <br /> YES— NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING <br /> PROTECTION ❑ 3 VINYL Wqqp ❑ d FIBERGLASS <br /> ❑ 5 CATHODIC PROTECTION>r9l NONE REINFORCED PLASTIC <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(Y ❑� UNKNOWN El 99 OTHER <br /> OVERFILL PREVENTION EOUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND SOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION <br /> A U 2 PRESSURE A GRAVITY <br /> B. CONSTRUCTION U 1 SINGLE WALL A U 2 DOUBLE WALL A U 99 OTHER <br /> C. MATERIAL AND A U BARE STEEL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A 5 ALUMINUM p U a CONCRETE <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION 7 STEEL WI ORATING A U g 100% METHANOL COMPATIBLE W/Fgp <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR A U 95 UNKNOWN A U 99 OTHER <br /> ❑ 2 LINE TIGHTNESS TESTING � 3 <br /> V.TANK LEAK DETECTION MONRoRINc X 99 OTHER <br /> ❑❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING <br /> ❑ 91 NONE ❑ 95 UNKNOWN <br /> 99 OTHER <br /> VL TANK CLOSURE INFORMATION <br /> 1.ESTIM T=p D TE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF <br /> SUBSTANCE REMAINING GALLONS <br /> 3.WAS TANK FILLED WITH YES <br /> NOX <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE <br /> IRRINTED a SIGNANRE)APPLICANTS NAME BEST OF MY KNO INERT LEDGE, IS TRUE AN❑D CORRECT <br /> DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW Re, C_ 3 b <br /> STATE I.D.# COUNTYu JURISDICTION FACI�� l0 <br /> PERMIT NUMBER <br /> m TANK p <br /> PERMIT APPROVED BY/DATE <br /> PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A.UNLESS A CURRENT FORM A HAS BE FILE s <br /> FORMS (12-91) <br /> FILE THIS FORM WITHifLOCAL AGENCY IMPLEMENTING THE UNDERGROUND ST AGE TANK REGULATIO <br /> 6.2 0 —CT-5 FO S-R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.