My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
555
>
2300 - Underground Storage Tank Program
>
PR0502282
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 11:55:34 AM
Creation date
11/7/2018 5:25:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0502282
PE
2381
FACILITY_ID
FA0005388
FACILITY_NAME
KNAPP FORD
STREET_NUMBER
555
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21726010
CURRENT_STATUS
02
SITE_LOCATION
555 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\555\PR0502282\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
8/11/2017 4:31:03 PM
QuestysRecordID
3572333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATA CHART FOR TANK SYSTEM TIGHTNESS TEST <br /> (EZY CHEK) <br /> CLIENT <br /> NAME OF SUPPLIER, p <br /> OWNER OR DEALER AA/-4 912 9 2,, r DATE OF TEST %ty',e-7� CN�r <br /> ADDRESS(NO.&STREET) SS r4z. 1-f 4/n/ WEATHER A.7 TEMPERATURE- <br /> CITY <br /> EMPERATURE CITY AND STATE <br /> TANK INFORMATION <br /> CAPACITY(NOMINAL) GALS. SIZE OF FILL OR TEST OPENING .42 IN. CONTENTS(PRODUCT) <br /> CAPACITY(CHART) GALS. TOP OFF TIME GALLONS TANK MATERIAL TSL <br /> DIMENSIONS:DIAMETER NUMBER OF GALLONS ADDED TO START TEST /_-Z APPROX.AGE <br /> LENGTH S/ TANK NO. PUMP SYSTEM(TYPE) 5"u� i �tl <br /> INCHES OF WATER—BEFORE TEST - - AFTER TEST _te� " <br /> TEST CALIBRATION - TANK LAYOUT <br /> SIZE OF CAL.BAR OR ML'S ADDED Iq/LLs <br /> (ALM) (FACTOR A) <br /> LINE MOVEMENT <br /> I to LINES <br /> 2 _z to _�2 7 = 7 LINES <br /> 3 to z_1z LINES <br /> TOTAL LINES - 3 - LINES <br /> (ALM) <br /> END OF TEST CALIBRATION <br /> SIZE OF CAL.BAR OR ML'S ADDED <br /> (ALM) (FACTOR A) <br /> LINE MOVEMENT <br /> 1 - to = UNES <br /> 2 to = LINES <br /> 3 to = LINES <br /> TOTAL LINES _ 3 = LINES <br /> (ALM] <br /> MEASURED API SPECIFIC GRAVITY - <br /> PRODUCT TEMPERATURE <br /> API SPECIFIC GRAVITY @ 60° F FROM TABLE A) <br /> COEFFICIENT OF EXPANSION neo 5��Gpz_ (FROM TABLE B) <br /> xOTA (FACTOR B) <br /> C.O.E. TL CAPACITY(GAL.) VOL.CHANGE/'F <br /> PRODUCT LINE TESTING SYSTEM <br /> Time Reading PRODUCT MONITORING ON LL Product <br /> Serial Number <br /> +Gai(Military) No. Start End +Gains—Loss X Factor A —Loss <br /> .003 <br /> 003 <br /> .003 <br /> .603 ! -rj'1FJirt.� Z,42 <br /> TECHNICIAN(S) DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.