My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
890
>
2300 - Underground Storage Tank Program
>
PR0231984
>
COMPLIANCE INFO 1988 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 9:03:15 AM
Creation date
11/7/2018 5:36:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2002
RECORD_ID
PR0231984
PE
2361
FACILITY_ID
FA0001393
FACILITY_NAME
MANTECA LIQUOR & FOOD
STREET_NUMBER
890
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22302007
CURRENT_STATUS
01
SITE_LOCATION
890 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\890\PR0231984\COMPLIANCE INFO 1988 - 2002.PDF
QuestysFileName
COMPLIANCE INFO 1988 - 2002
QuestysRecordDate
2/24/2017 7:28:18 PM
QuestysRecordID
3343089
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR./* <br /> Facility Name /y/q/l�%G'�/9 L/�/ ✓U� f' a� <br /> Facility Address O! Cy <br /> A. Describe the frequency of performing themtoring- 'w // 62 <br /> Tank /., Ajyyo Ze��Io f S:= Z ' <br /> Piping_�A IA III a l t G,^/� 7"p-& _ � �_.,� �4 c4o /�e <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: // l <br /> Tank L AlG-Icb tu, A-roAl �L-e�cl� <br /> Piping S ° R <br /> C. Describe the locancti(s) where the monitoring will be performed (facility plot plan <br /> shouldQ /be a ched): /' <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the eq 'pment: <br /> ;I old rV4s111, 7 o wNzr�l <br /> E. Reporting format fo; m omto g. . <br /> Tank <br /> Piping , Zt.� .t;� <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance wi the maa acturers' mai tenance schedule <br /> but not less than every L' months: V J l - <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: � � v- o <br />
The URL can be used to link to this page
Your browser does not support the video tag.