My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
890
>
2300 - Underground Storage Tank Program
>
PR0231984
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:57:15 PM
Creation date
11/7/2018 5:37:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231984
PE
2361
FACILITY_ID
FA0001393
FACILITY_NAME
MANTECA LIQUOR & FOOD
STREET_NUMBER
890
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22302007
CURRENT_STATUS
01
SITE_LOCATION
890 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\890\PR0231984\BILLING 2007 - 2015 .PDF
QuestysFileName
BILLING 2007 - 2015
QuestysRecordDate
2/27/2017 6:37:10 PM
QuestysRecordID
3344567
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORMOW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME) A „�e CQ l; 0 S 3. <br /> BUSINESS SITE ADDRESS I?j 0 N M • S 103 CITY M A 0,}e C� (4 la. <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAWMANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be perfomled at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED ❑ 1.ANNUALLY ❑ 99.OTHER(Specify): 490.3' <br /> . _. 490.36 <br /> M.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490.4 <br /> IV.TANK MONITORING IS PERFORMED USINGTHE FOLLOWING METHOD(S): <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM, 0904 <br /> PANEL MANUFACTURER: 4i 4A 2✓ 490'3. MODEL <br /> LEAK SENSOR MANUFACTURER a90a. I MODEL#(S): 1,S o 690.10 <br /> Lj 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S),(23 CCR§2643) 490.11 <br /> PANEL MANUFACTURER: 490'12 MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 090.14 MODEL#(S): •Salt <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ C.WEEKLY 490.16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 49x13 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 4a1a <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.19 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS 490.31 <br /> Lj S.TANK INTEGRITY TESTING(23 CCR§2643.1): 21 <br /> 4990-v <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49°14 <br /> 4W0. <br /> ❑99.OTHER (Specify): 490-M <br /> 490.2] <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWINGMETHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> i SECONDARY CONTAINMENT IS: DRY ❑b.LIQUIDFILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-39 <br /> �ANEL MANUFACTURER V 2 -GY 690'30 MODEL#: (, S to 2 ea 69°'31 <br /> `' EAK SENSOR MANUFACTURER E 2p j eV L5m(- 490'33 MODEL#(S): a rJ 49°-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 13 a YES ❑b.NO °90.11 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49°x5 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MILD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR26 490.M <br /> MLLDMANUFACTURERS): E "P a. ,� o YD 490,13 MODEL#(S): icy, 'J M 490.3e <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.pJL LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURERS) 49040 MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.pA 491N2 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490<3 <br /> ELLDFAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑&YES ❑b.NO d9660 <br /> $.PIPE INTEGRITY TESTING 49x15 <br /> TEST FREQUENCY 0 a.ANNUALLY Q b.EVERY 3 YEARS Q c.OTHERS 49045~ <br /> Lj S.VISUAL PIPE MONITORING. 490x5 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 410.49 <br /> .•Allowed fire monitor oFimbuded eeentor bur i'n oN HSC 28391.5 3) <br /> ❑ §.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(1)(3)(. 490-50 <br /> 7:NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.71S CONNECTED TO THE TANK SYSTEM <br /> 490. I <br /> ❑ <br /> 1!09.OTHER(Specify) 49052 <br /> 490.53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.