My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231489
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:50:11 PM
Creation date
11/7/2018 5:45:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231489
PE
2381
FACILITY_ID
FA0000309
FACILITY_NAME
MCHENRY STATION & MINI MART
STREET_NUMBER
1405
STREET_NAME
MAIN
STREET_TYPE
ST
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
1405 MAIN ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\1405\PR0231489\COMPLIANCE INFO .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />0 <br />WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Namec�cl.��' ir�ti �li� •-�a�9f <br />Facility .Address J-e,�c i �- c c /?4 <br />A. Describe the frequency of performing the monitoring: <br />Tank <br />Piping_(_.c�,E%� <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />TankT�ctu C,�T� i/y •� ,CC_'�tc�- fi <br />Piping - <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): _ <br />e52 7- <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />E. Reporting format for monitoring: <br />Tank�ti�� <br />PiDina Ti s it .rr �- <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note; <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: 4,55, <br />G. Describe the training necessary for the operation of LIST system, including piping, <br />and the monitoring equipment: <br />s' <br />
The URL can be used to link to this page
Your browser does not support the video tag.