Laserfiche WebLink
• <br />0 <br />WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Namec�cl.��' ir�ti �li� •-�a�9f <br />Facility .Address J-e,�c i �- c c /?4 <br />A. Describe the frequency of performing the monitoring: <br />Tank <br />Piping_(_.c�,E%� <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />TankT�ctu C,�T� i/y •� ,CC_'�tc�- fi <br />Piping - <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): _ <br />e52 7- <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />E. Reporting format for monitoring: <br />Tank�ti�� <br />PiDina Ti s it .rr �- <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note; <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: 4,55, <br />G. Describe the training necessary for the operation of LIST system, including piping, <br />and the monitoring equipment: <br />s' <br />