Laserfiche WebLink
BOARD OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT <br />James Culbertson, P(es. <br />Patricia E. Ite Von Spronsen aznnuccl, Secy. <br />Anlhonetl1601 East Helton Avenue, P. O. Box 2009 <br />An <br />Earl Pimenlel Stockton, Callfornla 95201 <br />Fern Bugbee <br />Daniel L. Flores 209/466-6761 <br />John 0. Mast, M.O. <br />William J. Wade� � 2Jo DI Khanna, M.D., M.P.H.• District Health Officer <br />Mary Anna Love ' <br />Facility Name V) <br />Address /-.O 7S M / N Sf <br />Date of Inspection 12-3 4Inspector <br />MONITORING ALTERNATIVE <br />SERVING <br />City of Lodi <br />San Joaquin County <br />City of Escalon <br />City of Mantecs <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />Sen Joaquin County <br />San Joaquin County <br />Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br />where the ligilic: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />�V Annual precision test on tank and piping. <br />t/ Tan7Tank <br />ing performed as follows: <br />must be capable of being secured to prevent unauthorized inputs and <br />ithdrawals. <br />V lank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />/' locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release Shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />Precision test(s) must be performed by and results submitted to this <br />office within 30 days of the test. <br />Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />