My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
COMPLIANCE INFO 1986-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:22:37 PM
Creation date
11/7/2018 5:50:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\4075\PR0231667\COMPLIANCE INFO 1986-1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A%ISM=l,Ml:; W C1 M"v 0T=kMlp + LMfl § <br />P.O. Box 80487 <br />Bakersfield, CR 93308 <br />805)326-0173 <br />RES — SYSTEM II <br />PRECISION TANK & LINE TEST RESULTS SUMMRRY <br />1flV§ip@ �ddp@§§1 TADW L@cAti@ni W.P,#. 18763 <br />STOCKTON PETROLEUM CO. STOCKTON PETROLEUM I.D. Numbor, N/A <br />PO BOX 326 4075 E MAIN TochnicianlPDB <br />STOCKTON, CA. 952-01 STOCKTON, CA. T@ch.#193-230 Van#10117 <br />Dates 03/16/94 Tim@ Starts 06:00 Endi 09:00 C®untyl SJ <br />Facility Phone#, 209-462-8707 Groundwater Depths 40' Blue Printsi N/A <br />Contacts JAY Data;Time system was filled' 12 HR. + <br />Tank Fill/Vent Product Type Of Vapor Inches of Pump Tank <br />Tank Capacity Product Tank Vapor Lines Line Recovery Water/Tank Type Material <br />1 6000 92UL PASS PASS PASS I 0 SUB 5WS <br />8 6000 89UL PASS PASS PASS I 0 SUB SWS <br />3 10000 87UL PASS PASS PASS I 0 SUB SWS <br />4 <br />5 <br />6 <br />Additi@nil inf@p'mltitinl THIS IS A c HR. FULL SYSTEM'S TEST. VENT AND VAPOR <br />LINES ARE FLOODED AND INCLUDED IN TEST. <br />SITE LOG TIME <br />Set <br />Up Equips <br />06000 <br />Bled <br />Product Linesi <br />06010 <br />Bled <br />Vapor Lines, <br />OPEN <br />Bled <br />Vent lines' <br />OPEN <br />Bled <br />Turbines <br />06000 <br />Bled <br />Suction Pump: <br />N/A <br />Risers <br />Installed, <br />YES <br />a> This system and method meets or oxc@@ds the crit@ria in USEPA &@CFR <br />part 280, NFPR 329-87 and all applicable state and local codes. <br />b> Any failure listed above may require further action, chock with <br />all regulatory agencies. <br />Copyright tc> 1989 by REB, Inc. <br />C@rtified Technician Signature 1 9'& y -D Date 163—/6-5'/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.