My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
611
>
2300 - Underground Storage Tank Program
>
PR0501306
>
REMOVAL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 1:36:03 PM
Creation date
11/7/2018 5:54:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1990
RECORD_ID
PR0501306
PE
2381
FACILITY_ID
FA0005060
FACILITY_NAME
DELTA NATIONAL BANK
STREET_NUMBER
611
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21937010
CURRENT_STATUS
02
SITE_LOCATION
611 N MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\611\PR0501306\REMOVAL 1990.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQLJI N LOCAL HEALTH D I S TR I CT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall be representative of native soils beneath the tank's <br /> invert [tank's bottom] at a collection depth not be exceed 2 - 4 feet. If contamination <br /> is documented during closure an Unauthorized Release notification must be filled out and <br /> submitted to SJLHD within 5 `days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Fill or pump end of tank <br /> 1000 - 10,000 gallons TWO per tank One at each end of tank <br /> 10,001 gallons and up THREE OR MORE Ends and Middle or <br /> per tankgenerally spaced along <br /> ?'he length of the tank <br /> Piping ONE EVERY 20 LINEAL FEET <br /> WATER IS PRESENT IN TANK PIT <br /> TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br /> SOIL SAMPLES SAMPLES OF WATER SAMPLES <br /> 10,000 GALLONS - From wall next to <br /> OR LESS tank ends at soil/ <br /> (Single Tank) TWOgroundwater ONE <br /> interface <br /> GREATER THAN From wall next to ONE <br /> 101000 GALLONS tank ends at soil/ <br /> ORgroundwater <br /> TANK CLUSTER FOUR interface <br /> OTHER S PEC I AL COND I T I ON S <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples. (Physical removal of the <br /> obstruction will then allow sampling according to the above conditions. ) <br /> - --- --- ------ - - - --- - --- ...._.._._._........ - - --... ...__... <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tankgenerall spaced along <br /> ?he length of the tank <br /> EH 23 047 12/88 " <br /> REVISED 1/89 RECEN <br /> AUG 16 1990 <br /> ENVPERHEALTH <br /> MIT/SERVâșCES <br />
The URL can be used to link to this page
Your browser does not support the video tag.