Laserfiche WebLink
t <br /> • i • DIRECTORS <br /> GENO GIANNECCHINI <br /> ANDREW WATKINS <br /> JACK H.TONE <br /> JACK LAVEN <br /> PAUL SANGUINETTI <br /> ALFRED B.BONNER <br /> THOMAS <br /> EDWARD M STEFFANI <br /> GENERALLMANAGER MANAGER <br /> VIRGIL L.WILL <br /> ASSISTANT MANAGER <br /> - . . <br /> JEANNE M.ZOLEZZI <br /> STa C KT O hI EAST WATER DISTRICT GENERAL COUNSEL <br /> 67�7aE.E. MAIN STREy 11 , �T9�g.O. BOX 5157 STOCKTON CA 95205-0157 2091948-4333 FAX 209/948-0423 <br /> Mr. Doug Wilson <br /> San Joaquin County PHS-EHD <br /> 304 East Weber Avenue 3rd Floor <br /> Stockton CA 95202 <br /> Subject : Treatment Plant -- Fuel Tanks <br /> Dear Mr. Wilson, <br /> In reference to the Closure In Place of one 10 , 000-gallon diesel <br /> underground storage tank (UST) at 5767 East Main Street, <br /> Stockton, California, we are providing the following information <br /> for your consideration: <br /> 1 . As previously stated in a letter to the San Joaquin County <br /> Public Health Services - Environmental Health Division (PHS- <br /> EHD) , the diesel UST located at the referenced site cannot <br /> be removed for upgrade without incurring structural damage <br /> to the adjacent pump building. Therefore, on behalf of the <br /> Stockton East Water District, Advanced GeoEnvironmental, <br /> Inc . (AGE) submitted a Closure In Place permit application. <br /> The permit application included procedures for filling the <br /> UST with a concrete slurry and collecting samples via direct <br /> push technology from beneath the UST. <br /> 2 . SEWD would like to make clear that excavation of hydrocarbon <br /> impacted soil can not be considered as remediation <br /> alternative because of the potential for structural damage <br /> to the pump building . <br /> 3 . SEWD will be replacing the UST with a double-walled above- <br /> ground storage tank (AST) . The AST will be located above <br /> the abandoned UST. However, installation of the AST cannot <br /> commence until the UST has been filled with concrete slurry. <br /> Therefore, we would like to complete the concrete slurry <br /> -Portion 61 the UST abandonment immediately. <br /> hould ave q es io ` , please do not hesitate to contact me . <br /> Very t myau.. <br /> I <br /> EDWARD M -<= PEFF <br /> General Manager <br /> W95-(TREATMENT PLANT)-WILSON <br />