My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
6767
>
2300 - Underground Storage Tank Program
>
PR0231856
>
COMPLIANCE INFO 1987-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:32 PM
Creation date
11/7/2018 5:54:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2003
RECORD_ID
PR0231856
PE
2381
FACILITY_ID
FA0004024
FACILITY_NAME
STOCKTON EAST WATER DIST
STREET_NUMBER
6767
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10117035
CURRENT_STATUS
02
SITE_LOCATION
6767 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\6767\PR0231856\COMPLIANCE INFO 1987-2003.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br /> DIESEL TANK <br /> NT MONTTORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring grogram must be bmt at the UST Iocation at all times. The information ou this moni[ori.n3 _ <br /> program are conditions of the operaiang permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division.phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unlcs required to obtain, approval before making the change. <br /> R--piired by Sections 2632(d) and 2641(h) CCR <br /> Facility Name Stockton East Water District <br /> Facility Address 6767 E. gain Street, Stockton, CA 95215 <br /> A. Describe the frequence of performing the monitoring: <br /> Tank Daily monitoring - Daily dip stick readings and meter readings <br /> PipingDaily inspection of piping and checking pump for air <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the morimring: <br /> Tank Dip stick with 4 Fluid Power Flow meters <br /> Piping Visual observations for leaks and checking pumps for air leaks. <br /> C. Describe the locations) where the monitoring w>71 be performed (facility plot plan <br /> should be attached): <br /> operations staff for daily monitoring and maintenance staff for repairs. <br /> At High service. <br /> D. List the name(s) and dde(s) of the people responsible for performing the monitoring <br /> and/or maintaining :he equipment: <br /> operations staff for daily monitoring and maintenance staff for repairs. <br /> epor ng to cepa r <br /> E. Reporting format ibr monitoring: <br /> TankDaily readings to monthly format <br /> Pipingaily inspections <br /> F. Describe the preve.-LLve maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than eyetT L months: Annual calibration of meters and tank testing <br /> G. Describe the tr aintE3-g necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: In house training of staff on reading meter and <br /> dip stick readings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.