My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
6767
>
2300 - Underground Storage Tank Program
>
PR0231856
>
COMPLIANCE INFO 1987-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:32 PM
Creation date
11/7/2018 5:54:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2003
RECORD_ID
PR0231856
PE
2381
FACILITY_ID
FA0004024
FACILITY_NAME
STOCKTON EAST WATER DIST
STREET_NUMBER
6767
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10117035
CURRENT_STATUS
02
SITE_LOCATION
6767 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\M\MAIN\6767\PR0231856\COMPLIANCE INFO 1987-2003.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GASOLINE TANK i# 1 <br /> W�= MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program mtut be l=pt at the UST location at all times_ The information on this monitoring <br /> program are conditions of the operating permit 'Ile permit holder must notify San Joaquin County <br /> Environmental Health Division.phone (209) 468-3.420 within 30 days of any changes to the monitoriug <br /> procedures, unkz required to obtain approval before maldug the change. <br /> Required by Sermons 2632(4) and 2641(h) CCR- <br /> Facility <br /> CRFacility Name Stockton East Water District <br /> Facility Address 6767 E. Main Street, Stockton, CA 95215 <br /> A Describe the frequency of performing the monitoring: <br /> Tank Monday through Friday <br /> Piping Monday EFE65u--gH Friclay <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monimring: <br /> Tank Dip Stick readings with meters. (Tokheim Model 793 MC) <br /> Piping Visual inspections for leaks. Check Lumps for air. <br /> C. Describe the locaticm(s) where the monitoring will be performed (faulty plot plan <br /> should be attached): <br /> At maintenance shop See nap) <br /> D. List the name(s) and dde(s) of the people responsfole for performing the monitoring <br /> and/or maintaining --he equipment: <br /> Charlie Soto - Maintenance Foreman <br /> Dennis Hill - Maintenance Mechanic II <br /> Vet Perez - Maintenance Mechanic I <br /> E_ Reporting format f=monitoring: <br /> Tank Daily readings Monday through Friday reported on monthly format <br /> pipinz D41y visual inspec ons <br /> F. Descrfoe the preve-eve maintenance schedule for the monitoring equipment- Note: <br /> Maintenance must be in accordance with the manufacturers, maintenance schedule <br /> but not less than every 12 months: Annual calibration of netter and tank testin <br /> G. Describe the tramgr necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: In house training of staff on reading meter Ad <br /> dip stick. <br />
The URL can be used to link to this page
Your browser does not support the video tag.