Laserfiche WebLink
GFNFRAI .\ P} }'ROLEl!'v1 CONMo%("1Okti0.ri4 <br /> a <br /> IIr.CNSE NO 759870 <br /> 6397 <br /> ''T"� P.O. CA 4603 <br /> ® • 9)70 "G ' STRF:'i OAKLAND CA 94603 <br /> X415: S67-5511 <br /> PARADISO CONSTRUCTION CLOSURE PLAN <br /> UNDERGROUND TANKS <br /> 1 . Obtain a permit for removal from the local Fire Prevention <br /> Agency and the local Enviromental Health Department , if <br /> required . <br /> 2 . Tank (s) are to be rendered product free prior to removal . <br /> a . Fifteen ( 15) pounds of dry ice per 1 , 000 gallons of tank <br /> capacity for flammable or combustible materials is to <br /> be introduced into each tank . <br /> 3 . Notify local Fire Prevention Bureau and Enviromental Health <br /> Department 48 hours in advance for inspection of tank removal . <br /> j._ tanks are to be removed _ _om the ; rr;perty on the _ -- <br /> day that the tanks are taken from underground . <br /> 5. All lines connected to tank(s) are to be completely removed . <br /> 6 . All electrical service to tanks is to be terminated and <br /> removed in accordance with the local Building Department <br /> Electrical Code . <br /> 7 . Soil samples are to be taken from the site for analysis for <br /> the presence of contaminants . <br /> a . The location and manner of sampling is to be determined <br /> by a soils engineer in accordance with applicable codes . <br /> 8 . The samples are to be submitted to an approved laboratory <br /> for analysis . <br /> 9 . The results of the analysis are to be provided to the <br /> Regional Water Quality Control Board and the local Fire <br /> Prevention Bureau . <br /> 10 . If evidence of contamination is present , a clean-up program <br /> which is approved by the Regional Water Quality Control Board <br /> will be formulated and executed . The local Fire Prevention <br /> Bureau is to be provided with documentation of Regional Water <br /> Quality Control Board approval by the responsible tank owner . <br /> 11 . When an excavation is not to be immediately backfilled , a <br /> fenced enclosure is to be erected around the open excavation . <br /> 12. Tanks to be disposed of by H&H Ship where they will be degased, steam <br /> cleaned and cut up. <br />